1875

1876

Recreation Grounds Board meeting. TH, 26 2 1876

Recreation Grounds Progress Update. TH, 8 3 1876

Request for Sections 1065 and 1084 from Public Trust Board. TH, 11 3 1876 

Recreation Grounds Board meeting. TH, 15 3 1876

Recreation Grounds Board meeting. TH, 29 3 1876 

Recreation Grounds Board meeting. TH, 12 4 1876

Recreation Grounds Board meeting. TH, 22 4 1876

First mention of Liardet Street Entrance. TH, 3 5 1876

Proposed Road through Recreation Ground (Public Trust Board). TH, 6 5 1876

Recreation Grounds Board meeting. TH, 10 5 1876 

Road through Recreation Grounds. TH, 17 5 1876

Fundraising Suggestions. TH, 20 5 1876

Notice of opening day. TH, 20 5 1876

Notice of opening day. TH, 24 5 1876

Recreation Grounds Board meeting. TH, 24 5 1876

Opening Day Ceremony. TH, 31 5 1876

Recreation Grounds Board meeting. TH, 7 6 1876

Request of Trees from Harbour Board Land. TH, 14 6 1876 

Request to Town Board for work on Liardet Street. TH, 17 6 1876

Recreation Grounds Board meeting. TH, 12 7 1876

Introduction of botanic garden act to parliament. NZ Mail, 22 7 1876

Taranaki Botanical gardens Bill 2nd Reading in legislature. TH, 26 7 1876

Recreation Grounds Board meeting. TH, 9 8 1876

Improved access from Liardet Street. TH, 16 8 1876

Recreation Grounds Board meeting. TH, 16 8 1876

Fundraising Advert. TH, 23 8 1876

Taranaki Botanical gardens Bill 1st Reading in house. TH, 23 8 1876

Recreation Grounds Board meeting. TH, 13 9 1876 

Taranaki Botanical gardens Bill 2nd Reading in house. TH, 13 9 1876

Taranaki Botanical gardens Bill Passes in house. TH, 4 10 1876 

Recreation Grounds Board meeting. TH, 11 10 1876

Recreation Grounds Board meeting. TH, 22 11 1876

1877

1878

1879

Public meeting about Formation of Swimming Club. TH, 15 1 1879

Recreation Grounds Board meeting – Bathing shed. TH, 21 1 1879

Public meeting about Bathing House. TH, 23 1 1879 

Public meeting about Bathing House. TH, 25 1 1879

Public meeting about Bathing House. TH, 31 1 1879 

Bathing House Design Proceeding. TH, 1 2 1879

Recreation Grounds Board meeting. TH, 8 2 1879

Bathing shed plans. TH, 12 2 1879

Paradise Ducks Released into Lake. TH, 4 3 1879

Tender for Erection Bathing House. TH, 6 3 1879

Recreation Ground Board meeting (AGM). TH, 11 3 1879

Notice of Erection of Bathing House. TH, 28 3 1879

Bathing shed update. TH, 1 4 1879

Notice of Swimming Competition. TH, 7 4 1879

Fundraising drama performance for bathing shed. TH, 8 4 1879

Swimming competition given go ahead. TH, 9 4 1879

Swimming Competition Account. TH, 10 4 1879

Bathing shed fundraising. TH, 11 4 1879 

Fundraising for Bathing House. TH, 23 4 1879

Fundraising for Bathing House. TH, 24 4 1879

Recreation Grounds Board meeting. TH, 17 5 1879

Recreation Ground Board meeting. TH, 8 7 1879

R H Thompson named on Committee. TH 9 7 1879

Town Board donation.TH, 9 7 1879

Recreation Ground Bye Laws. TH, 16 7 1879

Letter to Editor re State of Grounds. TH, 6 8 1879

Eels caught in Recreation Grounds. TH, 1 10 1879

Recreation Ground Board meeting. TH, 6 10 1879

Call for a Meeting with intention of forming a Swimming Club. TH, 3 11 1879

Forming of Swimming Club. TH, 7 11 1879

Swimming Club’s first Competition. TH, 5 12 1879

Advert for Swimming Competition. TH, 9 12 1879 

Swimming Competition Results. TH, 11 12 1879 
Recreation Ground Board meeting. TH, 12 12 1879

1880

1881

1882

Fight in the park. TH, 16 1 1882

Annual Swimming Tournament Ad. TH, 6 2 1882

Rec Board told to stop removing earth from Liardet St. TH, 6 2 1882

Bellringer blames Recreation Board for state of Liardet Street. TH, 7 2 1882

Pig on the end of a greasy pole TH, 7 3 1882

Swimming competition results. TH, 9 3 1882

Fancy Fair Ad. TH, 27 3 1882

Fancy Fair. TH, 30 3 1882

Recreation Grounds Board meeting. TH, 8 4 1882

Rescue at the Lake. TH,22 4 1882

Dr Hector donates plants. TH, 15 6 1882

Board approaches council for money. TH, 4 7 1882

Boards financial position clarified in deposition to council. TH, 5 7 1882

Salmon in the lake. TH, 25 7 1882

Borough council debate Rec funding. TH, 8 8 1882

Letter to editor re Recreation Grounds. TH, 28 8 1882

State of finances and improvements to grounds – Furlong’s fountain. TH, 30 8 1882

Letter from Board to Town Council threatening to hand over control of grounds. TH, 5 9 1882 

Recreation Ground Board meeting. TH, 21 9 1882

Juvenile Fancy Dress Ball. TH, 22 9 1882

Juvenile Fancy Dress Ball Account. TH, 5 10 1882

Recreation Ground Board meeting. TH, 13 10 1882

Paratawhiti ferns donated to Recreation Grounds. TH, 16 10 1882

Results of Juvenile Fancy Dress Ball. TH, 17 10 1882

Proposal of recovering part of swamp for lawn. TH, 20 10 1882

Proposed Improvements to Rec. TH, 27 10 1882

Tender accepted for Swamp ReclamationTH, 27 10 1882

Donations of Fish. TH, 2 11 1882

Promenade Concert. TH, 6 11 1882

Recreation Ground Board meeting. TH, 6 11 1882

Programme for volunteer band. TH, 7 11 1882

Improvements update. TH, 25 11 1882

Promenade concert review. TH, 29 12 1882

First mention of bandstand. TH, 2 12 1882

Another fountain. TH, 28 12 1882

1883

Recreation Ground Board meeting – Bandstand. TH, 6 1 883

Black Swans donated to Rec – one dies on route. TH, 16 1 1883

Advert banning dogs from Rec – will be shot. TH, 17 1 1883

Swan dies. TH, 20 1 1883

Advert for Ye Olde English Fayre. TH, 1 2 1883

Ye Old English Fayre. TH, 6 2 1883

YE OLDE ENGLISH FAYRE. TH, 9 2 1883

Ye Old English Fayre. TH, 9 2 1883

YE OLDE ENGLISH FAYRE. TH, 10 2 1883

YE OLDE ENGLISH FAYRE. TH, 12 2 1883

Ye Old English Fayre. TH, 12 2 1883

YE OLDE ENGLISH FAYRE. TH, 13 2 1883 

Annual Swimming Tournament Programme. TH, 21 2 1883

Receipts from Ye Old English Fayre. TH, 21 2 1883

Huges Pond – Dam breaches. TH, 23 2 1883

Recreation Ground Board meeting. TH, 24 2 1883

Tender for lawn extension. TH, 28 2 1883

Annual swimming tournament results. TH, 1 3 1883

Board’s balance sheet for 1882. TH, 6 3 1883

Lake drained and Prussian carp lost. TH, 17 3 1883

Lake drained for dam repair. TH, 21 3 1883

Plant Donations. TH, 6 4 1883

First mention of The Poets Bridge. TH, 24 4 1883

Eucalyptus and Golden Wattle seeds received. TH, 26 4 1883

Supply of blue gum seeds. TH, 12 6 1883

Reply to supply of blue gum seeds. TH, 13 6 1883

Recreation Ground Board meeting – The Poet’s Bridge. TH, 18 6 1883

Advert for design of The Poet’s Bridge. TH, 20 6 1883

Clarifying bridge construction. TH, 25 6 1883

Last call for designs of The Poet’s Bridge. TH, 12 7 1883

Six designs for The Poet’s Bridge. TH, 14 7 1883

Designs of The Poet’s Bridge selected. TH, 16 7 1883

Board meeting bridge design chosen. TH, 19 7 1883

Tenders for The Poet’s Bridge Erection. TH, 21 7 1883

Working plans of bridge complete. TH, 23 7 1883

Clarification of building material. TH, 27 7 1883

Tenders received for bridge construction. TH, 4 8 1883

Hooker and Campbell Awarded Bridge Construction. TH, 7 8 1883

Sunflower Minstrels Show advert. TH, 3 9 1883

Sunflower Minstrel show. TH, 4 9 1883

Sunflower Minstrels show proceeds. TH, 22 9 1883

Open air concert during Governor’s visit. TH, 29 10 1883

Bridge update. TH, 19 11 1883

Recreation Ground Board meeting. TH, 24 111883

Bridge construction update. TH, 26 11 1883

1884

1885

Letter complementing Recreation Ground. TH, 21 1 1885 

Swimming Club Organising Competition. TH, 30 1 1885

Naming of Recreation Ground Egmont Park Suggested. TH, 2 2 1885

Advert for swimming Gala. TH, 4 2 1885

Bunting installed for swimming Carnival. TH, 7 2 1885

Ladies Bathing Area Provided. TH, 7 2 1885

Liardet Street gates under construction – Ladies bathing area being used. TH, 7 2 1885

Near Drowning in the Lake. TH, 7 2 1885

Chew Chong offers flagstaff. TH, 10 2 1885

Plaque to be ordered for The Poet’s Bridge. TH, 11 2 1885

Recreation Ground Board meeting. TH, 11 2 1885

Visitor offers garden seats for park. TH, 11 2 1885

A thousand people attend swimming tournament – Results. TH, 12 2 1885

Accounts for 1884. TH, 27 2 1885

Fountain fixed. TH, 2 3 1885 

One of Furlong’s lake statues destroyed. TH, 2 3 1885

Tender for Flagstaff erection. TH, 3 3 1885

Broken statue. TH, 5 3 1885

Recreation Ground Board meeting-Egmont Park name adopted – Chew Chong flagpole. TH, 7 3 1885

Change of Name to be confirmed. TH, 9 3 1885

Remaining lake statue blown over. TH, 17 3 1885

W Bennett collected money for Rec. TH, 17 3 1885

Name change suggestion for Recreation Ground. TH, 31 3 1885

Captain Davidson commits suicide. TH, 8 4 1885 

Captain Davidson Inquest. TH, 8 4 1885 

Permission given for football in the Recreation Grounds. TH, 11 4 1885

Recreation Ground Board meeting. TH, 11 4 1885

Chew Chong flagstaff. TH, 25 4 1885

Donation of seven Seats. TH, 7 5 1885

Government appoint F P Corkhill to Board. TH, 12 5 1885

Large tree planting from donation. TH, 23 5 1885 

New Path to be made by Strawberry Patch. TH, 8 6 1885

Fish in park. TH, 9 6 1885 

Carp to be put in lake. TH, 9 6 1885

Board successful in cultivating Australian golden Wattle. TH, 7 7 1885

Recreation Ground Board meeting- vases – flagpole seats. TH, 18 7 1885

Request for boundary survey. TH, 18 7 1885

18 7 1885 Thinking about angling licences. TH,

Large vases for rec ground. TH, 30 7 1885

Tree donation from Mitchinson and Messenger (Pohutukawa). TH, 24 8 1885

Trout found in lake. TH, 25 8 1885 

Gravel put in Lake for trout. TH, 5 9 1885

Mitchinson donates water liliy plants. TH, 12 9 1885

More plant donations. TH, 21 9 1885

Puriri donated by Captain Wilson. TH, 30 9 1885 150

Iron garden seats from UK. TH, 3 10 1885

Box planted round lake. TH, 5 10 1885

More plant donations. TH, 12 10 1885

Recreation Ground Board meeting. TH, 21 10 1885

Notice of fireworks display. TH, 24 10 1885 

Fireworks display account. TH, 6 11 1885

Garden seats and seats around Flagstaff. TH, 17 11 1885

Recreation Ground Board meeting – Bandstand. TH, 17 11 1885

Swamp reclamation for cricket and rugby. TH, 30 11 1885

Moonlight Band Concert ad. TH, 11 12 1885

Request for bandstand. TH, 14 12 1885 

Recreation Ground Board meeting. TH, 19 12 1885

Donation from Union Boating Club. TH, 21 12 1885

Lake evaporating. TH, 28 12 1885

1886

Boy eats poisonous tutu berries. TH, 18 1 1886

Larrakins throwing glass in lake. TH, 1 2 1886

Recreation Ground Board meeting. TH, 1 2 1886

Swimming tournament programme. TH, 2 2 1886

Aquatic sports results. TH, 23 2 1886

Bathing times questioned. TH, 27 2 1886

Bandstand estimate requested from Scott bros. TH, 12 3 1886

Claffey catches poacher. TH, 23 3 1886

Donation given for park seats. TH, 30 3 1886

Strawberry trees damaged. TH, 5 4 1886 

Lake cleaning and extension. TH, 10 4 1886

Recreation Ground Board meeting – Gates finished. TH, 10 4 1886

Recreation Ground Board meeting – Rotunda. TH, 12 6 1886

Trees to be planted. TH, 7 1886

Black wattle trees hit by frost. TH, 26 7 1886

Trout in the lake. TH, 26 7 1886

An overview of improvements. TH, 4 8 1886

Fundraising for rotunda. TH, 12 8 1886

Recreation Ground Board meeting – Section 1086 purchased. TH, 14 8 1886

Fancy dress ball fundraiser for Rotunda. TH, 21 8 1886

List of fireworks for upcoming display. TH, 3 9 1886

Plants stolen. TH, 9 10 1886

Recreation Ground Board meeting. TH, 9 10 1886

Dead horse buried outside entrance to Rec. TH, 12 10 1886

Flagstaff struck by lightening. TH, 27 10 1886

Swimming club AGM. TH, 30 10 1886

Plant donation. TH, 11 11 1886

Board meeting ladies bathing hours and fishing licenses. TH, 13 11 1886

Red flag introduced for ladies bathing due to change of bathing hours. TH, 13 11 1886

Complaint about cost of firework display entry. TH, 15 11 1886

Firework display write up. TH, 17 11 1886

Bandstand to proceed. TH, 22 11 1886

Recreation Ground Board meeting. TH, 22 11 1886

Davis duped by boys fishing. TH, 26 11 1886

Fishing in the lake. TH, 3 12 1886 

Recue at the lake. TH, 6 12 1886

Recreation Ground Board meeting. TH, 22 12 1886

Donations for band performance – incl buttons etc. TH, 29 12 1886

1887

Links for this section to come shortly

1888

1889

1890

Recreation Ground Board meeting. TH, 4 1 1890

Update on athletics ground. TH, 4 1 1890

George Bros win tender to build sports track. TH, 14 1 1890

Aquatic sports committee. TH, 28 1 1890

Aquatic sports programme. TH, 28 1 1890

Water lilies in lower pond. TH, 28 1 1890

Takings from Aquatic sports. TH, 30 1 1890

Jubilee Aquatic Sports results. TH, 30 1 1890

Fire in park. TH, 4 2 1890

Education Board – section 1084 exchange in park. TH, 8 2 1890

Fennel in the park. TH, 11 2 1890

Recreation Ground Board meeting. TH, 17 2 1890

Improvements to main gate. TH, 18 2 1890

Account of band concert and Fireworks display. TH, 22 2 1890

Ground improvements. TH, 26 2 1890

Entrance gate update. TH, 1 3 1890

Inaugural Sports meeting. TH, 3 3 1890

Gate Improvements postponed. TH, 7 3 1890

Sports ground update. TH, 19 3 1890

Working bees to clear hills around sports ground. TH, 24 3 1890

Lifeboat in grounds for sports day. TH, 5 4 1890

Sports meeting update. TH, 5 4 1890

Results of inaugural Sports meeting. TH, 8 4 1890

Maloney missing TH, 12 4 1890

Maloney murder TH, 14 4 1890

Maloney murder suspect spotted TH, 14 4 1890

Maloney burial TH, 15 4 1890

Maloney murder rumours TH, 16 4 1890 

Maloney inquest day 1 part 1. TH, 21 4 1890

Maloney inquest Day 1 part 2. TH, 21 4 1890

Coroner’s Jury visit scene TH, 22 4 1890

Pair of fancy ducks from canterbury. TH, 22 4 1890

Maloney inquest continues TH, 4 5 1890

Maloney inquest part 2. TH, 4 5 1890

Maloney inquest TH, 5 5 1890

Maloney inquest TH, 6 5 1890

Maloney inquest part 2, TH, 6 5 1890

Maloney inquest from 6 May cont. TH, 7 5 1890

Maloney inquest TH, 8 5 1890

Big trout in lake. TH, 10 5 1890

Swans leave lake. TH, 20 5 1890

Lost swans found. TH, 9 6 1890 

Recreation Ground Board meeting. TH, 10 6 1890

Ad for November athletics meet. TH, 21 8 1890

Appeal for funds for Liardet street gate. TH, 6 9 1890

Plant donations. TH, 13 9 1890

Tender for gate erection. TH, 27 9 1890

Ornamental gate erection started. TH, 8 10 1890

Advert for fundraising bazaar. TH, 31 10 1890

Lifeboat being repaired. TH, 3 11 1890

Bazaar in aid of park a huge success. TH, 11 11 1890

New Entrance at Liardet Street completed. TH, 25 11 1890

Tender notice for erecting of Band Rotunda. TH, 20 12 1890

Bazaar takings. TH, 23 11 1890

1891

Band Rotunda tender accepted. TH, 12 1 1891

Band rotunda arrives. TH, 16 2 1891

Jubilee sports day programme. TH, 16 2 1891

Fire at the bathing shed. TH, 26 2 1891

Fire at the bathing shed court case. TH, 27 2 1891

Damage to Park (Midweek) 27 2 1991

Band Rotunda not as ordered. TH, 2 3 1891

Donations for gates at rec ground. TH, 9 3 1891

Gates at Liardet St entrance. TH, 9 3 1891

Fire at the bathing shed court case. TH, 17 3 1891

Letter to the editor. TH, 23 3 1891

Jubilee programme. TH, 24 3 1891

Sports track almost finished. TH, 25 3 1891 

Jubilee celebration preparation. TH, 28 3 1891 

Jubilee sports day review. TH, 31 3 1891

Completed bandstand used during Jubilee. TH, 1 4 1891

Money from jubilee. TH, 9 4 1891

Advert for Athletic and military exhibition. TH, 15 4 1891

Fire at the bathing shed court case. TH, 16 4 1891 

Athletics and military games. TH, 17 4 1891

Salisbury put on bread and water. TH, 18 4 1891

Review of athletic and military exhibition. TH, 20 4 1891

Salisbury sentenced. TH, 29 4 1891

Full list of sports ground sponsors. TH, 29 5 1891

Organising fundraising opera. TH, 30 5 1891

Recreation Ground Board meeting – Fookes land purchase. TH, 16 6 1891

Description of Recreation grounds. TH, 2 7 1891

Fillis street land bought (Fookes). TH, 4 7 1891

Peacock presented to the park. TH, 13 7 1891

Donation to board. TH, 3 8 1891

Board meeting  land purchased Bayley donates cannon. TH, 10 8 1891

Donations for planting. TH, 14 8 1891

Kidd brought in to help with planting. TH, 20 8 1891

Plant donations. TH, 20 8 1891

Native plant donation. TH, 28 8 1891

TRV Band Farewell Concert. TH, 10 9 1891

Kidd supervising Plantings. TH, 12 9 1891

Peacock missing. TH, 12 9 1891

Taranaki refugee fund donation. TH, 14 9 1891

Death of J T Davis. TH, 18 9 1891

Inquest part 1 of J T Davis. TH, 18 9 1891

Davis inquest. TH, 19 9 1891

Funeral of J T Davis. TH, 21 9 1891

Kidd helps with tree planting. TH, 6 10 1891

Recreation Ground Board meeting. TH, 12 10 1891

September planting list. TH, 13 10 1891

Grass seed laid on sports track. TH, 26 10 1891

Donation via Criterion Hotel. TH, 28 10 1891

Emu offered to board. TH, 31 10 1891

Recreation Ground Board meeting. TH, 7 11 1891

Board reject Emu offer. TH, 14 11 1891

Collis takes photos of grounds with new camera. TH, 21 12 1891

Collis selling new stereo photos of park. TH, 23 12 1891

Request for bulbs for the park. TH, 31 12 1891

1892

Recreation Ground Board meeting. TH, 12 1 1892

Reducing hill on Carrington Road.TH, 12 1 1892

Memorial to J T Davis. TH, 19 1 1892

Bulbs wanted + list of annual subscribers. TH, 21 1 1892

Recreation Ground Board meeting. TH, 8 2 1892

Annual subscriptions. TH, 12 2 1892

Easter Monday Sports Day programme. TH, 16 4 1892

Sports Day Results. TH, 19 4 1892

Opening flower beds to schools. TH, 20 4 1892

Recreation Ground Board meeting. TH, 22 4 1892

Modifying main lake. TH, 4 5 1892

Fernery at waterfall. TH, 9 5 1892 

Recreation Ground Board meeting. TH, 9 5 1892

Board to consider carriage track round ground. TH, 11 5 1892

Tenders for concrete work on lake outlet. TH, 12 5 1892

Public asked to plant flower beds. TH, 13 5 1892

Mrs Hursthouse takes charge of one Flower Bed. TH, 21 5 1892

Recreation Ground Board meeting. TH, 4 6 1892

Committee agree to allow football and cricket on sports field. TH, 9 6 1892

Recreation Ground Board meeting. TH, 9 7 1892

Fern donation from John Wheeler. TH, 21 7 1892

Recreation Ground Board meeting- maze offered. TH, 5 9 1892

Peacock killed. TH, 12 9 1892

Plantings in the park. TH, 12 9 1892

Cricket club lay down pitch. TH, 15 9 1892

Juvenille sports day. TH, 6 10 1892

Maze description. TH, 6 10 1892

Recreation Ground Board meeting. TH, 10 10 1892

Swimming club reformed. TH, 17 10 1892

Recreation Ground Board meeting. TH, 5 11 1892

Arrangements for juvenile sports day. TH, 7 11 1892

Maori canoe offered. TH, 7 11 1892

New bridge – offer to superintend construction. TH, 7 11 1892

Juvenile Sports Day results. TH, 10 11 1892

First cricket match. TH, 14 12 1892

1893

Note of Collis photo of Recreation Grounds. TH, 3 1 1893

Whale bones. TH, 21 1 1893

Recreation Ground Board meeting. TH, 25 1 1893

Letter to editor – Cannon hill faced. TH, 27 1 1893

Swimming comp organised. TH, 28 1 1893

Court case re dogs in park (newton king). TH, 30 1 1893

Aquatic Sports programme. TH, 2 2 1893

Easter Monday Athletics sports programme. TH, 6 2 1893 

Recreation Ground Board meeting. TH, 11 2 1893

Accounts 1892. TH, 16 2 1893

Collis photo using new process. TH, 27 2 1893

Aquatic Sports results. TH, 3 3 1893

Recreation Ground Board meeting – Kiwi gifted. TH, 6 3 1893

Cavill swimming exhibition. TH, 17 3 1893

Whale bones arriving. TH, 29 3 1893

Athletic sports a success. TH, 4 4 1893

Plants and whale bones stolen. TH, 8 4 1893

Recreation Ground Board meeting. TH, 8 4 1893

Corkill charged with taking dog into grounds. TH, 10 4 1893

Captain mace donates plants. TH, 12 5 1893

Fountain lake maze article. TH, 22 5 1893

Plants donated. TH, 15 6 1893

Flooding in park. TH, 7 7 1893

Recreation Ground Board meeting. TH, 11 7 1893

Plant donations – Arden helping with planting. TH, 22 7 1893

Recreation Ground Board meeting. TH, 14 8 1893

Taranaki v Auckland. TH, 30 8 1893 

Recreation Ground Board meeting (boatshed and new bridge). TH, 6 9 1893

Unusual planting. TH, 20 9 1893

Misses Albu’s concert. TH, 21 9 1893

Promenade Concert. TH, 30 9 1893

Concert promotion. TH, 2 10 1893

Write up of concert in park. TH, 3 10 1893

Fundraising for the Recreation Grounds. TH, 7 10 1893

E.M. Smith donates black swan. TH, 9 10 1893

Recreation Ground Board meeting. TH, 10 10 1893

Fundraising concert. TH, 13 10 1893

Fundraising concert review. TH, 13 10 1893

Funds received. TH, 21 10 1893

New lower lake filled. TH, 4 12 1893

Recreation Ground Board meeting – Whale bones – Maze. TH, 4 12 1893

Goldfish released into new lake. TH, 18 12 1893

Sports Day. TH, 30 12 1893

1894

First Annual Athletics Carnival. TH, 2 1 1894

Lake pics on chinaware. TH, 8 1 1894 

Pea fowl donation. TH, 8 1 1894

Water polo in the park. TH, 9 1 1894

Results from Gymnasium sports day. TH, 11 1 1894

Sports results 2. TH, 12 1 1894

Recreation Ground Board meeting. TH, 7 2 1894

Ad for citizens ball. TH, 12 3 1894

Recreation Grounds Athletic Sports Day Programme. TH, 12 3 1894

Balloonist Leila Adair advert. TH, 31 3 1894

Notice of madame Adair’s Balloon Jump. TH, 31 3 1894

Madame Adair.TH, 5 4 1894

Football Tournament results – Adair balloon burnt. TH, 6 4 1894

Recreation Ground Board meeting. TH, 7 4 1894

Thinning out pine trees. TH, 16 4 1894 

Thinning out pine trees. TH, 20 4 1894

Bathing shed broken into. TH, 23 4 1894

Offer of assistance cutting down trees. TH, 23 4 1894

Working bee successful. TH, 26 4 1894

Working bee successful. TH, 27 4 1894

Another working bee. TH, 2 5 1894

Summary of work 1893 – Boatshed Bridge flagstaff  cannons  whale bones. TH, 2 5 1894

Recreation Ground Board meeting. TH, 5 5 1894

Arden to supervise working bee. TH, 9 5 1894

Charles Francis drowned in lake. TH, 11 5 1894

Charles Francis drowned in lake – inquest. TH, 14 5 1894

Newton King donation for new bridge. TH, 14 5 1894

Working bee a success. TH, 18 5 1894

Section 1135. TH, 23 5 1894

Section 1135. TH, 26 5 1894 

Section 1135. TH, 28 5 1894 

Another working bee. TH, 29 5 1894

Section 1135. TH, 31 5 1894 

Sports Ground caretaker appointed. TH, 7 6 1894

Recreation Ground board meeting. TH, 9 6 1894

Planting on Fillis St boundary. TH, 12 6 1894

Purchase of section 1135. TH, 4 6 1894

Recreation Ground Board meeting – Roy resigns. TH, 9 7 1894

Dig at board. TH, 11 7 1894

Recreation Ground Board meeting. TH, 8 8 1894

Ad for china with park pictures on it. TH, 22 8 1894

Letter to editor re cricket pitch. TH, 28 8 1894

W L Newman appointed to board. TH, 29 8 1894

Recreation Ground Board meeting. TH, 8 9 1894

Johnny Fro book goes on sale. TH, 10 10 1894

Fishing licences. TH, 16 10 1894

Fireworks display Ad. TH, 13 11 1894

Johhny Fro a fairytale book to raise funds for Mr Hood. TH, 3 12 1894

Board in financial difficulties. TH, 11 12 1894

Recreation Ground Board meeting. TH, 11 12 1894

Athletics Club 2nd annual carnival programme. TH, 14 12 1894

Fireworks display advert. TH, 17 12 1894

Firework display a success. TH, 18 12 1894

Swimming club clement Wiggins. TH, 18 12 1894

Darby’s donkey difficult to ride. TH, 22 12 1894

1895

Town Band concert in the Recreation Grounds. TH, 11 2 1895

Fijian cricketers have a dip in the lake. TH, 26 2 1895

Recreation Ground Board meeting. TH, 27 2 1895

Eltham and Ngaire children picnic in the Rec. TH, 1 3 1893

Easter Monday Sports Day programme. TH, 6 3 1895

Notice of Working Bee. TH, 6 3 1895

Plants stolen. TH, 13 3 1895

South Taranaki school picnic. TH, 15 3 1895

Account of working bee.TH, 6 3 1895

Board allowed to fence off part of racecourse. TH, 16 3 1895

Garden seat donation. TH, 20 3 1895

Annual Report for work carried out during 1894. TH, 21 3 1895

Inglewood school outing. TH, 22 3 1895

Working bee. TH, 27 3 1895

Surplus funds from sports day to go towards pavilion. TH, 5 4 1895

Recreation Ground Board meeting. TH, 9 4 1895

Byelaws. TH, 10 4 1895

Fundraising afternoon tea for sports day. TH, 10 4 1895

Fancy Dress Football Match. TH, 22 4 1895

Arden asking for plants donations for the park. TH, 23 4 1895

Bylaws updated. TH 10 4 1895

Working bee. TH, 15 5 1895

Ladies thanked for providing refreshments at working bees. TH, 11 6 1895

Jockey club gives park use of land. TH, 24 6 1895

Recreation Ground Board meeting. TH, 16 7 1895

Arbor Day planting of land from jockey club. TH, 30 7 1895

Recreation Ground Board meeting. TH, 3 8 1895

Arbor Day planting in the park. TH, 8 8 1895

Recreation Ground Board meeting. TH, 13 9 1895

Prof Furlong promotes Aquatic carnival in park. TH, 20 9 1895

Sports Ground committee six-year summary. TH, 21 9 1895

Recreation Ground Board meeting. TH, 5 10 1895

Poem. TH, 18 10 1895

Assistance with Maze requested. TH, 7 11 1895

Assistance with Maze requested. TH, 9 11 1895

Winding up swimming club. TH, 21 11 1895

Winding up swimming club. TH, 23 11 1895

Maze work continues. TH, 7 12 1895

Recreation Ground Board meeting. TH, 7 12 1895

Suicide in the lake.TH, 16 12 1895

Suicide in the lake – Inquest.TH, 17 12 1895

1896

Rec Board’s notice of Claffey’s dismissal. TH, 13 1 1896

Recreation Ground Board meeting. TH, 13 1 1896

Darby Claffey’s Letter to TH about his dismissal from the park. TH, 18 1 1896

Recreation Ground Board meeting. TH, 10 2 1896

Charles Edgecombe appointed custodian. TH, 7 3 1896

Recreation Ground Board meeting. TH, 7 3 1896

Easter Monday Sports Day programme. TH, 13 3 1896

Darby’s donkey sold. TH, 4 4 1896

Recreation Ground Board meeting. TH, 11 4 1896

Trouble between Claffey and Edgecombe. TH, 11 4 1896

Darby Claffey issues an apology. TH, 15 4 1896

Chairman’s Annual Report. TH, 25 4 1896

Recreation Ground Board meeting. TH, 11 5 1896

Fundraising concert for recreation grounds. TH, 27 5 1896

Mr. Harris Ford presented with clock. TH, 13 6 1896

Recreation Ground Board meeting. TH, 13 6 1896

Art Union prize description. TH, 26 6 1896

Recreation Ground Board meeting. TH, 6 7 1896

Fundraising football match. TH, 22 7 1896

Fundraising painting for Art Union. TH, 22 7 1896

Help wanted for Arbor Day planting. TH, 1 8 1896

Arbor Day Planting. TH, 3 8 1896

Thinning out of pines – free firewood. TH, 3 8 1896

Arbor Day Planting. TH, 4 8 1896

Taranaki’s first interprovincial game v Nelson. TH, 4 8 1896

Arbor Day Advert. TH, 5 8 1896

Arbor Day Planting. TH, 7 8 1896

Recreation Ground Board meeting. TH, 17 8 1896

Thinning out trees. TH, 17 8 1896

Cabbage tree blight in the Recreation Grounds. TH, 31 8 1896

Floral Fete Ad. TH, 5 9 1896

Recreation Ground Board meeting. TH, 7 9 1896

Swans – sports ground. TH, 8 9 1896

Board allowed to take plants from meeting of the waters. TH, 12 9 1896

Sheep put on Sports ground to tread on sown grass. TH, 23 9 

Inaugural meeting of the NP Amateur Athletics and Cycling club. TH, 8 10 1896

Recreation Ground Board meeting. – T K skinner plant donation TH, 13 10 1896

Floral Fete advert. TH, 30 10 1896

Floral Fete advert. TH, 4 11 1896

Account of first floral fete. TH, 10 11 1896

Floral display at main gate. TH, 11 11 1896

Recreation Ground Board meeting. TH, 11 11 1896

Amateur Athletics Meeting advert. TH, 14 11 1896

Money from floral fete. TH, 19 11 1896

Proposed mods for cycle track. TH, 10 12 1896

Recreation Ground Board meeting. TH, 24 12 1896

1897

1898

1899

1900

1901

Links for this section to come shortly

Protection of Tui in Recreation Grounds. TH, 7 1 1901

Five-pound reward for capture of people destroying Rimu trees. TH, 16 1 1901

Queen Victoria memorial service ad. TH, 29 1 1901

Victorias memorial service TH,4 2 1901

Volunteer Band. TH, 5 2 1901

Recreation Ground Board meeting. TH, 6 2 1901

Swimming carnival. TH, 14 2 1901

Star sports day TH, 23 2 1901

Another name offered. TH, 14 3 1901

Flagstaff from Auckland. TH, 19 3 1901

Fireworks display and concert review. TH, 9 4 1901

Recreation Ground Board meeting. TH, 6 5 1901

Plant donations. TH, 17 5 1901

Tukapa v Star 2000 spectators. TH, 1 5 1901

Another call for name change (Victoria Park). TH, 10 6 1901

Edgecombe goes to Raglan for plants. TH, 25 7 1901

Plants Edgecombe brought back from raglan. TH, 19 8 1901

Recreation Ground Board meeting. TH, 19 8 1901

Sportsground plans almost complete. TH, 19 8 1901

Fundraising football matches. TH, 17 9 1901

Kowhai flowering in the Recreation Grounds. TH, 27 9 1901

Recreation Ground Board meeting. TH, 7 10 1901

Zinc tablets for tree names. TH, 17 10 1901

Sash and door company donate 500 ft 2-inch planking. TH, 25 10 1901

Recreation Ground Board meeting. TH, 2 11 1901

Alexander the Australian Blondin Advert. TH, 3 12 1901

Alexander the Australian Blondin demonstration. TH, 3 13 1901

Blondin’s rope hung in Recreation Grounds. TH, 4 12 1901

Recreation Ground Board meeting. TH, 7 12 1901

Grand open-air concert and Fireworks display. TH, 18 12 1901

Fireworks display promotion. TH, 19 12 1901

Fireworks display a success. TH, 27 12 1901

1902

Recreation Ground Board meeting. TH, 29 1 1902

Liardet Street Gates in need of painting. TH, 31 1 1902

Central school boys learning to swim. TH, 11 2 1902

White swans arrive. TH, 14 2 1902

E M Smith donates six white swans. TH, 17 2 1902

Band contest week advert. TH, 18 2 1902

Central School swimming carnival. TH, 26 2 1902

Fundraising – English fete. TH, 3 3 1902

Liardet Street gates painted. TH, 6 3 1902

Recreation Ground Board meeting. TH, 10 3 1902

Band contest garden party. TH, 12 3 1902

Train driver benefit concert. TH, 12 3 1902

Marching contest. TH, 13 3 1902

Easter fete huge success. TH, 1 4 1902

Recreation Ground Board meeting. TH, 3 5 1902

Acclimatisation Society  fish ponds. TH, 12 5 1902

Wild ducks fill the Recreation Grounds. TH, 27 5 1902

Acclimatisation Society provide funds to feed wild ducks. TH, 11 6 1902

Two swans found dead on sports field. TH, 13 6 1902

Seeds from South Africa given to Recreation Grounds. TH, 18 6 1902

Supervisor appointed for sports events. TH, 5 7 1902

Recreation Ground Board meeting. TH, 14 7 1902

Plant donations. TH, 21 7 1902

Plant donations. TH, 28 7 1902

Coronation programme. TH, 5 8 1902

Recreation Ground Board meeting. TH, 16 10 1902

Fish ponds established. TH, 24 10 1902

Testament to hardness of cricket pitch. TH, 25 11 1902

Upcoming cricket game against Lord Hawke’s English XI. TH, 13 12 1902

Pair of Russian Geese donated. TH, 29 12 1902

Advert for cricket match against English 11. TH, 30 12 1902

Pitch preparation for international cricket game. TH, 30 12 1902

1903

North Taranaki v Lord Hawke’s XI. TH, 2 1 1903

North Taranaki v Lord Hawke’s XI – result. TH, 3 1 1903

Trout fry ready for release. TH, 9 1 1903

Volunteer camp in the Recreation Grounds. TH, 15 1 1903

Pair of paradise ducks donated. TH, 3 2 1903

Star club’s annual sports day. TH, 17 2 1903

Preserving rarer native trees. TH, 20 3 1903

Proposal for gully below racecourse (Stainton Dell). TH, 26 3 1903

Request to proceed with Wiggins Memorial. TH, 26 3 1903

Appeal by C. W. Govett for donations to Recreation Grounds. TH, 21 4 1903

Reply to appeal by C. W. Govett for donations to Recreation Grounds. TH, 22 4 1903

Chopping contest results. TH, 2 5 1903

Recreation Ground Board meeting. TH, 6 5 1903

Empire Day fancy football match. TH, 16 5 1903

List of annual subscribers to Recreation Grounds. TH, 19 5 1903

Flooding in the recreation Grounds. TH, 28 5 1903

Trout released from ponds in Recreation Grounds. TH, 20 6 1903

Plant donations. TH, 13 7 1903

Peacock gifted to Recreation Grounds. TH, 21 8 1903

Stone for Wiggins memorial arrived. TH, 26 8 1903

Taranaki beat Auckland (Rugby). TH, 2 9 1903

Fry released into ponds. TH, 5 9 1903

Improving the swamp. TH, 5 9 1903

Recreation Ground Board meeting. TH, 5 9 1903

Floral Fete advert. TH, 19 10 1903

Fry into ponds also improvements to grounds. TH, 22 10 1903

Recreation Ground Board meeting. TH, 26 10 1903

Floral Fete. TH, 3 11 1903

Plant donation from T K Skinner. TH, 5 11 1903

Fireworks display advert. TH, 17 12 1903

Scheme to improve sportsground. TH, 17 12 1903

Draining swamp to racecourse. TH, 21 12 1903

Recreation Ground Board meeting. TH, 21 12 1903

Recreation Ground Board meeting. TH, 21 12 1903

Sports Ground drainage. TH, 21 12 1903

1904

Opposition to sports ground expansion. TH, 5 1 1904

Opposition to sports ground expansion. TH, 7 1 1904

Tenders for ploughing sports field. TH, 11 1 1904

Summer school. TH, 22 1 1904

Trout fry dying due to heat. TH, 22 1 1904

Grand carnival advert. TDN, 9 2 1904

Grand carnival advert. TH, 10 2 1904

Water lilies donated TH, 15 2 1904

Advert for wood chopping competition. TH, 23 4 1904

Acclimatisation Society report on state of fish ponds in Recreation Grounds. TH, 25 4 1904

Mayor seeks disclosure of finances. TH, 1 5 1904

Borough councillor’s selected to sit on Recreation Ground Board. TDN, 5 5 1904

Increased subsidy to Recreation Ground agreed. TH, 17 5 1904

Recommended converting old hospital. TH, 20 5 1904

Recreation Board Accounts for 1903. TH, 24 5 1904

E H Tribe appointed Secretary and Treasurer of Recreation Grounds Board. TH, 31 5 1904

Recreation Ground Board meeting. TH, 31 5 1904

Possible improvements to Sports Ground. TDN, 1 7 1904

Letter about changes to Sports Ground. TDN, 4 7 1904

Recreation Ground Board meeting. TH, 4 7 1904

Ad for tender for military hospital. TDN, 6 7 1904

Letter about changes to Sports Ground. TDN, 6 7 1904

Pea hen wanted for Recreation Grounds. TH, 9 7 1904

Some future improvements to be made. TH, 9 7 1904

Letter to editor seeking donations. TH, 11 7 1904

Tenders for moving hospital. TH, 23 7 1904

Newton King granted extension for removal of old military hospital. TDN, 27 7 1904

Taranaki v England rugby game advert. TH, 11 8 1904

Taranaki v England rugby game advert. TH, 13 8 1904

Taranaki v Britain game account. TH, 18 8 1904

More views on changes to Sports Ground. TH, 20 8 1904

A pair of opossums released into the Recreation Grounds. TH, 30 8 1904

First provincial soccer match in Taranaki advert. TH, 31 8 1904

First provincial soccer match. TH, 1 9 1904

Report on Taranaki Auckland soccer match. TH, 2 9 1904

Scum on lake after big earthquake. TH, 2 9 1904

Illegal operation in Recreation Grounds TDN, 12 9 1904

Illegal operation at the Band Rotunda. TH, 19 9 1904

Donations including opossums. TH, 20 9 1904

Recommendations to raise sports field. TH, 27 9 1904

10000 fry released. TH, 29 9 1904

Recreation Ground Board meeting. TH, 5 10 1904

Suggestions for improving Sports Ground. TH, 5 10 1904

Borough Council acquire land and old hospital for recreation land. TH,3 12 1903

Recreation Ground Board meeting. TH, 16 12 1904

Carnival Ad. TH, 17 12 1904

Mention of Glowworm Caves. TH, 21 12 1904

Pea hen donated to Recreation Grounds. TH, 21 12 1904

Preparation for fireworks display. TH, 26 12 1904

1905

Swimming carnival and Fireworks display. TH, 2 1 1905

Athletics Sports advert. TH, 3 1 1905

Children’s day advert. TH, 4 1 1905

Military Tournament Advert. TH, 11 1 1905

Military parade – premier’s speech. TH, 13 1 1905

Military hospital (The Gables) rebuilt at Brooklands. TH, 31 1 1905

Vandals in the recreation Grounds. TH, 4 2 1905

Annual subscriptions. TH, 14 2 1905

Recreation Ground Board meeting. TH, 21 2 1905

Complaints about lack of transparency of Recreation Grounds Board. TDN, 22 2 1905

Response to Daily News letter. TDN, 24 2 1905

Yearling trout released from ponds. TH, 3 1905

Tea House to proceed. TH, 16 3 1905

Description of Tea House TH, 22 3 1905

Erection of Tea house starts. TDN, 10 4 1905

Recreation Ground Board meeting – tea rooms started and Sports Ground improvements.TH, 12 4 1905

Star Sports Day. TH, 22 4 1905

Chairman’s Report. TDN, 28 4 1905

Recreation Ground Board meeting. TH, 4 5 1905

Donations to Recreation grounds. TH, 5 5 1905

Recreation Ground Board meeting. TH, 10 7 1905

Donation of plants for planting around new Tea Room. TH, 26 7 1905

Recreation Ground Board meeting – sportsground. TH, 4 8 1905

Herbarium talked about. TDN, 8 8 1905

Herbarium talked about. TDN, 19 8 1905

Assistant custodian job advert. TDN, 8 9 1905

Recreation Ground Board meeting. TH, 8 9 1905

Recreation Ground Board meeting. TH, 13 9 1905

Scheme for improving Sports Ground. TH, 14 9 1905

Plea for funds for Sports Ground development. TH, 30 9 1905

Land for lease. TH, 10 10 1905

Isabella Small Bequest. TH, 16 10 1905

More talk of herbarium. TDN, 2 11 1905

Tea House advert. TH, 7 11 1905

Tea House superintendent appointed. TH, 8 11 1905

New Borough Councillor on Recreation Grounds Board. TH, 14 11 1905

Agreement reached on sportsground development. TH, 15 11 1905

Donation. TH, 15 11 1905

United sports committee gets volunteers. TH, 17 11 1905

Councillor Collis to sit on new Sports Gound committee. TH, 23 11 1905

First meeting of Sports Ground improvement committee. TH, 27 11 1905

Start of fundraising for Sports Ground improvements. TH, 30 11 1905

Sports Ground improvements committee meeting. TH, 1 12 1905

Tea House advert. TH, 5 12 1905

Door to door canvassing for Sports Ground fund. TH, 12 12 1905

Sports Ground Committee fundraising. TDN, 12 12 1905

Sports Ground improvements proposed.TH, 13 12 1905

Jockey Club appoint member to Sports Ground Committee. TH, 14 12 1905

Recreation Grounds Sports Committee thanking sponsors. TH, 14 12 1905

Takings from canvassing for Sports Ground funds. TH, 18 12 1905

Large donation to Sports Ground fund. TH, 21 12 1905

1906

Sport Ground committee meeting TDN, 11 1 1906

Sports Ground committee meeting TH, 25 1 1906

Euchre party fundraising. TDN, 27 1 1906

Sports Ground committee meeting. TH, 9 2 1906

Concert fundraiser for Sports Ground funds. TH, 15 2 1906

Garden Party Programme. TH, 20 2 1906

Swimming Sports . TDN, 20 2 1906

Madsen bequest . TH, 21 2 1906

Successful Fete. TH, 22 2 1906

Successful Fete. TH, 22 2 1906

Euchre Party fundraising. TH, 6 3 1906

Boys try to kill pea foul. TH, 9 3 1906

Annual Subscriptions. TH, 12 3 1906

Fundraising Concert. TH, 13 3 1906

Star Sports Day. TDN, 11 4 1906

Handsome bequest. TH, 26 4 1906

List of donors to Sports Ground fund. TDN, 1 5 1906

Recreation Ground Board meeting. TH, 3 5 1906

More fundraising. TH, 21 5 1906

Recreation Ground Board meeting. TDN, 29 5 1906

Rugby pitch not fit to play on. TDN, 1 6 1906

Recreation Ground Board meeting. TH, 7 6 1906

Trouble with cyclists. TDN, 7 6 1906

Annual report for 1905. TH, 14 6 1906

Sedden memorial service. TDN, 22 6 1906

Sub soil from railway deviation for sports field. TH, 30 6 1906

Tender for carting soil. TH, 2 7 1906

Tenders for carting soil. TH, 5 7 1906

Call to demolish Wiggins memorial. TH, 12 7 1906

Topsoil offered for sports ground. TDN, 16 7 1906

Fundraising dance. TH, 23 7 1906

Date set for handing over sportsground. TH, 25 7 1906

Recreation Ground Board meeting. TH, 25 7 1906

New entrance at Gilbert Street. TDN, 26 7 1906

Plant being moved from sportsground area. TDN, 26 7 1906

Recreation Ground Board meeting. TH, 11 8 1906

Commemorative tablet placed on Cannon Hill. TH, 22 8 1906

Bucking Bronco for garden fete. TDN, 30 8 1906

Tender accepted for tree removal. TH, 8 9 1906

Labour Day demonstration fundraiser. TH, 18 9 1906

Tender for enlarging sportsground. TH, 18 9 1906

Tree cutting started – circular saw employed. TH, 21 9 1906

Gander ends up on plate. TDN, 25 9 1906

Tree planting list TH, 28 9 1906

Fireworks display. TH, 6 10 1906

Extraordinary fireworks. TH, 8 10 1906

Advert for Labour Day celebrations and fireworks display. TH, 9 10 1906

Labour Day – Trade Fair. TH, 10 10 1906

Recreation Ground fete account. TDN, 11 10 1906

Sports Ground update. TH, 15 10 1906

New entrance at Gilbert Street. TH, 7 11 1906

Recreation Ground Board meeting. TH, 10 11 1906

Update on sportsground progress. TH, 19 11 1906

Sports Committee report. TH, 5 12 1906

Recreation Ground Board meeting. TH, 7 12 1906

Central School swimming pool . TH, 20 12 1906

1907

Sportsground update terraces draining etc. TH, 5 2 1907

Fireworks display. TH, 8 2 1907

20,000 trout in nurseries. TH, 18 2 1907

Sports ground progress. TH, 18 2 1907

Donation to central school baths. TH, 20 2 1907

Central school pool. TH, 21 2 1907

Drain pipes arrive on site. TH, 28 2 1907

Flowering Gum tree. TH, 2 3 1907

Grass seed donated for sports field. TH, 12 3 1907

Mace has accident. TH, 14 3 1907

Donations. TH, 19 3 1907

First suggestion of Serpentine development. TH, 20 3 1907

Sportsground update terraces draining etc. TH, 4 4 1907

Topsoil for Sportsground. TH, 15 4 1907

Donation to sports ground development. TH, 19 4 1907

Recreation Ground Board annual meeting . TH, 23 4 1907

Offer to supply plants. TH, 10 5 1907

Terrace faces to be turfed. TH, 11 5 1907

Carrington Road entrance widened. TH, 15 5 1907

Turf for the terraces. TH, 25 5 1907

Seats required for sports ground. TH, 3 6 1907

Seat donations for the sports ground. TH, 21 6 1907

Plants donated. TH, 24 6 1907

Seat donations for the sports ground. TH, 25 6 1907

Notice re prosecution if caught damaging terraces. TH, 3 7 1907

Proposed name change to Pukekura Park. TH, 11 7 1907

Recreation Ground Board meeting. TH, 11 7 1907

Rip Van Winkle fundraiser. TH, 13 7 1907

Recreation Ground Board meeting – more improvements. TH, 17 7 1907

Native birds in park. TH, 19 7 1907

Seat donation for sports ground. TH, 22 7 1907

Sports ground plantings. TDN, 1 8 1907

Donations to sports ground. TH, 7 8 1907

Council agree to Fillis Street changes. TH, 13 8 1907

Sports ground improvements. TH, 13 8 1907

Entertainment programme for sports ground. TH, 31 8 1907

Poor drainage from sports ground. TH, 9 9 1907 

Edgecombe returns from Raglan. TH, 16 9 1907 

Fundraising. TH, 18 9 1907

Tree planting in park. TH, 19 9 1907 

Serpentine construction to start. TH, 21 9 1907

Fundraising concert. TDN, 23 9 1907

Recreation Ground Board meeting. TH, 23 9 1907

Fundraising concert. TH, 27 9 1907 

Praise for Sports ground Committee. TDN, 1 10 1907

Sheep found to graze new sports field. TH, 8 10 1907

Donations towards Serpentine construction. TH, 16 10 1907

Donation of a row of seats. TH, 25 10 1907

Recreation Ground Board meeting – name change. start of serpentine. TH, 7 11 1907

Working bee to prepare new wicket. TDN, 8 11 1907

Alternative name suggestion – Plymouth Park. TH, 13 11 1907

Central School baths. TH, 20 11 1907

Notice of opening of Pukekura Park Sports Ground. TH, 2 12 1907

White swan has cygnets. TDN, 2 12 1907

Notice of opening of Pukekura Park Sports Ground. TH, 4 12 1907

Sports Ground Committee annual report. TH, 7 12 1907

Sports Ground Committee AGM. TH, 7 12 1907

Sports Ground opening day advert. TH, 10 12 1907

Donations wanted to finish terrace seating. TH, 16 12 1907

Cricket wicket ready for play. TH, 18 12 1907

Athletics meeting Ad. TH, 21 12 1907

Seat donations. TH, 24 12 1907

Serpentine update. TH, 24 12 1907

Fireworks display. TH, 27 12 1907

First cricket match on new ground. TH, 27 12 1907

Opening of sports ground. TH, 30 12 1907

1908

Links for this section to come shortly

Official opening of Sports Ground. TH, 2 1 1908

25lb eel found during serpentine excavation. TH, 3 1 1908

Letter from Chairman congratulating Sports Committee. TH, 3 1 1908

NZ Athletics Championships. TH, 7 1 1908

Fillis street fence. TH, 11 1 1908

Park Update. TH, 14 1 1908

Pukekura Park Board Meeting. TH, 18 1 1908

Park improvements. TH, 27 1 1908

Praise for sports ground. TH, 29 1 1908

F P Corkill letter mentions maze. TH, 30 1 1908

Sports Ground improvements for Championship Athletic meet. TH, 30 1 1908

Electric Lights for Sports Ground. TH, 4 2 1908

Donation for horse drawn roller. TDN, 5 2 1908

Donation for horse drawn roller. TH, 5 2 1908

Request for Sports Ground Seats TH, 6 2 1908

Update on Sports Ground improvements. TDN, 6 2 1908

Park development update. TH, 17 2 1908

Sports Ground seat donation. TH, 18 2 1908

Smiths Manawatu debacle. Manawatu Times, 22 2 1908

Park update. TH, 24 2 1908

Roller for sports ground. TH, 25 2 1908

Review of Athletics meet. TH, 27 2 1908

Band competition results. TH, 28 2 1908

W W Smith appointed curator. TH, 10 3 1908

Smith formerly accepts position of curator. TH, 13 3 1908

Palmerton North resident try to get Smith back. TH, 17 3 1908

Work started on Central School pool. TH, 19 3 1908

W W Smith started work. TH, 21 3 1908

Pukekura park Board Meeting. TH, 7 4 1908

BM – Park Board to seek bigger subsidy. TH, 8 4 1908

Sports Ground fundraising for electric lights. TH, 13 4 1908

Board go cap in hand to council. TH, 14 4 1908

Interview with ww smith. TH, 14 4 1908

Pukekura park Board Meeting. TH, 14 4 1908

Annual report. TH, 22 4 1908

Steps being erected to terraces. TDN, 29 4 1908

Palmerston North trying to woo Smith back. TDN, 11 5 1908

Council meeting urging a salary increase to keep Smith. TH, 12 5 1908

Assistant curator ad. TH, 13 5 1908

Duck shot in park. TDN, 26 5 1908

Pukekura Park  land for lease. TH, 27 5 1906

Pukekura Park Board Meeting. TH, 27 5 1906

Central school baths proposal. TH, 30 5 1908

Swan returns to park. TH, 30 5 1908

Progress of swimming pool for Central School. TH, 3 6 1908

Park gets increased subsidy to retain Smith. TH, 9 6 1908

Smith plants fernery on island. TH, 12 6 1908

Progress of Central School Pool. TH, 16 6 1908

Land for lease by auction. TH, 24 6 1908

Mr Crozier donates kiwi. TH, 26 6 1908

Improvements to sports ground. TH, 30 6 1908

Plant donations. TH, 1 7 1908

Curator’s report. TH, 4 7 1908

Taranaki v Britain ad. TDN, 14 7 1908

Taranaki v Britain result TH, 16 7 1908 

Taranaki v Britain game writeup TH, 16 7 1908

Central school baths nearly complete. TH, 22 7 1908

Meeting to recognise Humphries role in sports ground development. TH, 29 7 1908

Central School boys help making path around pool. TH, 30 7 1908

New drain being installed at sports field. TH, 3 8 1908

Show of golden wattle. TH, 3 8 1908

Land Slip near glowworm. TDN, 6 8 1908

Smith injures himself. TH, 11 8 1908

Curators Report . TH, 8 9 1908

Pond in Stainton dell. TH, 8 9 1908

Pukekura park Board Meeting. TH, 8 9 1908

Small lakelet in Stainton dell. TH, 9 9 1908

Collecting plants from Egmont TH, 12 9 1908

Practice wicket being prepared. TH, 17 9 1908

Fundraising. TH, 24 9 1908

Smith erecting pergola plus 3 more stories. TDN, 24 9 1908

W W Smith erecting a pergola. TDN, 24 9 1908

Goslings and fundraising. TH, 13 10 1908

Dogs worrying sheep on sports ground. TH, 14 10 1908

Central School pool and another article TH, 15 10 1908

About Picnic and floral fete TDN, 16 10 1908

Pukekura park Board Meeting. TH, 21 10 1908

Children’s picnic. TH, 7 11 1908

Pukekura Park Board meeting. TH, 4 12 1908

1909

1910

Upcoming fireworks display article. TH, 15 1 1910

Board Meeting. TH, 18 1 1910

Fireworks display ad. TDN, 21 1 1910

Fireworks display write up. TH, 22 1 1910

Proposed fish hatchery. TH, 5 2 1910

Board Meeting. TH, 8 2 1910

Tea kiosk ad. TH, 10 2 1910

Visit of H. M. S. Pegasus ad. TDN, 14 2 1910

Sports meeting with crew of H. M. S.  Pegasus. TH, 16 2 1910

Shackleton movie in the park. TDN, 17 2 1910

Shackleton movie write up. TH, 18 2 1910

Smith on noxious weeds. TH, 21 2 1910

W W Smith offer to name plants. TH, 21 2 1910

Tea kiosk ad. TH, 14 2 1910

Taranaki v Australia cricket ad. TH, 18 3 1910

Taranaki v Australia cricket. TDN, 21 3 1910

Caledonian sports ad. TH, 23 3 1910

Taranaki v Australia cricket match report. TDN, 23 3 1910

Horse fell down terraces. TDN, 24 3 1910

O Samuel donation. TH, 30 3 1910

Govett donation. TH, 6 4 1910

Australian cricketers praise ground. TH, 12 4 1910

Fundraising dance ad. TH, 16 4 1910

Central School pool abandoned. TH, 27 4 1910

Near drowning. TH, 3 5 1910

Pukekura Park Board A. G. M. TH, 3 5 1910

Smith and Smith to collect plants. TH, 3 5 1910

Smiths kiwi observations with weka. EVENING POST, 7 5 1910

Update on fish ponds. TDN, 11 5 1910

King’s funeral. TDN, 21 5 1910

Donations TH, 7 6 1910

Board Meeting. TH, 7 6 1910

Board Meeting re tennis club. TDN, 16 6 1910

Tennis and croquet club tender for courts. TDN, 25 6 1910

Inaugural meeting to form tennis and croquet club. TDN, 1 7 1910

Smiths ad for kiwis. TH, 4 7 1910

Board Meeting. TDN, 5 7 1910

W W Smith report. TDN, 5 7 1910

Forking of cricket pitch. TH, 23 7 1910

Tennis and croquet club meeting. TH, 26 7 1910

Board Meeting. TH, 2 8 1910

Sports Ground fundraising. TH, 8 8 1910

Hockey game. TH, 9 8 1910

Tennis and croquet club meeting. TH, 10 8 1910

Tennis and croquet club meeting progress report. TH, 30 8 1910

Letter from W. C. T. U. regarding Sunday tennis. TDN, 6 9 1910

Board Meeting. TH, 6 9 1910

Call for improvement to Vogeltown entrance. TDN, 10 9 1910

Tennis court progress. TDN, 10 9 1910

Tennis court development. TDN, 17 10 1910

Swans for lake. TH, 9 11 1910

Hot Air Ballon demonstration ad. TH, 23 11 1910

Tennis and Croquet Club meeting progress report. TDN, 23 11 1910

Hot Air Ballon article. TDN, 24 11 1910

Hot Air Ballon flight. TDN, 25 11 1910

Board Meeting. TDN, 6 12 1910

Swan flies into cable. TH, 19 12 1910

Fireworks display ad. TH, 21 12 1910

Start made to tennis club rooms. TDN, 21 12 1910

Tennis club ready to open. TDN, 31 12 1910

1911

1912

Visitors letter. TDN, 30 1 1912

Board Meeting. TH, 6 2 1912

Undervalued Park. TH, 6 2 1912

Tribe resigns as secretary. TH, 7 2 1912

W W Smith on botanical expedition. TDN, 12 2 1912

Park Saturday’s fundraising. TDN, 14 2 1912

Swimming sports proposal. TH, 17 2 1912

Park Saturday. TH, 19 2 1912

Discussion re handing over Board to council. TDN, 23 2 1912

Talk of handing over to council. TDN, 24 2 1912

Letter from Govett. TH, 26 2 1912

Park Saturday. TH, 27 2 1912

Park Saturday. TDN, 4 5 1912

Board Meeting. TH, 5 3 1912

Results of Park Saturday fundraising. TH, 5 3 1912

Big donation. TH, 6 3 1912

Suggestion of friends of the park. TH, 6 3 1912

High school swimming comp. TH, 9 3 1912

Fundraising. TH, 1 4 1912

Slippery paths. TH, 10 4 1912

Kiwi gift. TH, 12 4 1912

Tea rooms under new management. TDN, 26 4 1912

Govett donation. TH, 7 5 1912

Smith’s kiwi breeding. TH, 16 5 1912

Kiwi killed by stoat. TDN, 17 5 1912

Annual meeting mention of peacock house. TH, 21 5 1912

Park board considering taking back sports ground. TDN, 21 5 1912

Planting and donations. TH, 21 5 1912

Pukekura Park Board A. G. M. TDN, 21 5 1912

Trees cut down. TH, 21 5 1912

Water-fowl in the park TDN, 27 5 1912

sports committee on defence. TDN, 21 5 1912

Movie about park. TDN, 3 6 1912

Changes to board. TDN, 25 6 1912

Death of peacock. TDN, 25 6 1912

Plants stolen. TDN, 25 6 1912

Board Meeting. TDN, 25 6 1912

C H Drew appointed secretary. TH, 26 6 1912

Inspector wanted. TDN, 31 6 1912

Smith enquiring about Kiwi nesting habits. TH, 5 7 1912 

Dogs killing birds. TDN, 6 8 1912

Board Meeting. TDN, 6 8 1912

Madsen bequest. TH, 7 8 1912

Inspector employed. TH, 14 8 1912

Tea rooms open all day. TH, 4 9 1912

Board Meeting. TDN, 11 9 1912

Board Meeting. TDN, 8 10 1912 

Springboard gone – Smith catching eels. TDN, 23 10 1912

Horse shoe fern. TDN, 5 11 1912

New footpath. TDN, 18 11 1912

Pinus halepensis. TH, 19 11 1912

Picture entertainment in the Park. TDN, 27 12 1912

Board Meeting. TH, 3 12 1912

Maori sports carnival. TDN, 17 12 1912

Repainting Tea kiosk. TH, 17 12 1912

1913

1914

1915

1916

Links for this section to come shortly

A sight in New Plymouth. TDN, 17 1 1916

Eels and ducklings. TDN, 2 2 1916

Hughes to write history. TDN, 2 2 1916

Board Meeting. TDN, 2 2 1916

Waterfowl stolen. TDN, 2 2 1916

Two Controlling ducks. TH, 8 3 1916

Long term on Board. TH, 8 3 1916

Board Meeting. TH, 8 3 1916

Kiwi donated. TDN, 18 3 1916

A jewel. TH, 2 4 1916

Board meeting. TDN, 5 4 1916

Board meeting. TH, 5 4 1916

Water supply from jockey club. TDN, 19 4 1916

Arboretum. TH, 27 4 1916

Letter from Smith’s son. TH, 27 4 1916

Board meeting. AGM TH, 3 5 1916

Board to take control of Sports Ground. TH, 3 5 1916

Offer to pay staff. TH, 3 5 1916

Park Board take possession of sports ground. TDN, 3 5 1916

Park Saturday. TDN, 23 5 1916

Park Saturdays. TH, 1 6 1916

Citizens Band concert. TH, 2 6 1916

Citizens band performance. TDN, 5 6 1916

Park Saturday receipts .TH, 6 6 1916

Clement Wragge offer advice. TH, 7 6 1916

Board Meeting. TH, 7 6 1916

W W Smith ill. TDN, 28 6 1916

Annual subscribers. TH, 5 7 1916

Letter praising park. TDN, 5 7 1916

Board Meeting. TH, 5 7 1916

Hulke bequest. TDN, 2 8 1916

Board Meeting. TH, 2 8 1916

Hughes Park History. part 1. TH, 3 8 1916

Hughes Park History. part 2. TH, 3 8 1916

Hughes Park History. part 3. TH, 3 8 1916

Hughes Park History. part 4. TH, 3 8 1916

Hughes Park History. part 5. TH, 3 8 1916

Hughes Park History. part 6. TH, 3 8 1916

C. E. Bellringer appointed to board. TH, 29 8 1916

Board Meeting. TH, 6 9 1916

Board Meeting. TDN, 7 9 1916

Plant donations, Cuckoo. TDN, 26 9 1916

Brass bands. TDN, 28 9 1916

Brass band review. TDN, 2 10 1916

New Vogeltown Entrance, Cannon vandalised. TH, 4 10 1916

Board Meeting. TH, 4 10 1916

Soldiers’ comforts week ad. TDN, 20 10 1916

Soldiers’ comforts week review. TDN, 23 10 1916

Rifles found. TDN, 24 10 1916

Bad swan. TH, 6 11 1916

Burgess donation. TH, 8 11 1916

Board meeting. TH, 6 12 1916 7

A chat with W. W. Smith. TH, 7 12 1916 

Board meeting. TDN, 7 12 1916

Smith’s kiwi story. TDN, 30 12 1916

1917

1918

1919

1920

Band Concert review. TH, 19 1 1920

Bad state of Sports Ground. TDN, 4 2 1920

Percy Smith honoured. TH, 4 2 1920

Board Meeting. TH, 4 2 1920

Sketch of proposed Tea House presented to Board. TDN, 4 2 1920

Board Meeting. TH, 3 3 1920 

Mrs Burgess fundraising proposal. TH, 3 3 1920

Pine tree removal discussions. TH, 3 3 1920

Tea House proposal to expensive. TDN, 3 3 1920

Board meeting, Mrs Burgess stirring it up. TDN, 5 3 1929

Tram route proposed through the Park. TH, 9 3 1920

£1000 fund proposal. TH, 24 3 1920

Prince of Wales to drive through park. TDN, 24 3 1920

Thousand pound fund. concert ad. TH, 29 3 1920

Board Meeting. TDN, 7 4 1920

Racecourse Walk widened for Prince of Wales visit. TDN, 7 4 1920

Sports Ground committee. TDN, 7 4 1920

Tram route through park. TDN, 7 4 1920

Prince of Wales visit arrangements. TH, 13 4 1920

Prince of Wales  visit seating. TH, 20 4 1920

Widows seating for Prince of Wales visit. TDN, 21 4 1920

Prince of Wales feathers. TDN, 24 4 1920

Board Meeting. TH, 27 4 1920

Fundraising ad. TH, 29 4 1920

Visit of Prince of Wales 3 may. TH, 3 5 1920

Visit of Prince of Wales 3 may. TH, 3 5 1920

Prince of Wales visit report. TDN, 4 5 1920

Board Meeting. TDN, 5 5 1920

Apple and Chrysanthemum Day fundraising. TH, 10 5 1920

Fundraising takings. TH, 15 5 1920

High School Old Girld street collection.  TH, 22 5 1920

Council to approach Park Board re trams through park. TH, 25 5 1920

Mrs Burgess targets £1000. TDN, 27 5 1920

Hockey tournament. TDN, 2 6 1920

Board Meeting. TH, 2 6 1920

Proposed tram route through Park. TH, 16 6 1920 

Shetland Pony donated for £1000 fund. TH, 17 6 1920

Boating on Sundays. TDN, 7 7 1920

Board Meeting. TH, 7 7 1920

Plant donations. TDN, 10 7 1920

Some pines culled. TH, 14 7 1920

Tree culling. TDN, 28 7 1920

£1000 events ad. TDN, 3 8 1920

Plant donations. TDN, 4 8 1920

Pukekura Park Board meeting. T DN, 4 8 1920

Board Meeting. TH, 4 8 1920

Day carnival opened. TDN, 5 8 1920 5

Park Carnival day 1 review. TH, 11 8 1920

Edgecombe dies. TDN, 12 8 1920

Park Carnival day 2 review. TH, 12 8 1920

Childs description of park. TH, 13 8 1920

Park Carnival closes. TH, 16 8 1920

New sports committee formed. TH, 18 8 1920

Burgess Interview. TDN, 21 8 1920

New sports committee. TH, 25 8 1920

Sports Ground pine trees removed. TDN, 26 8 1920

Reopening fish ponds in park. TH, 27 8 1920

Donations. TDN, 8 9 1920

Modifications to Tea Kiosk. TH, 8 9 1920

Board Meeting. TH, 8 9 1920

Damage to terraces. TDN, 10 9 1920

Board Meeting. TDN, 6 10 1920

Timber sold. TH, 6 10 1920

White swans donated. TDN, 14 10 1920

Trout holding ponds finished but fish released by larrakins.TH, 25 10 1920

W W Smith resigns. TDN, 25 10 1920

Letter to Editor re W W Smith resignation. TDN, 26 10 1920

W W Smith resignation – the Board’s position. TH, 3 11 1920

Board Meeting. TDN, 4 11 1920

White swans go walk-about. TH, 4 11 1920

Letter from W W Smith to paper re resignation. TH, 5 11 1920 

Board meeting, hatchery considered. TH, 8 12 1920

Board Meeting. TDN, 8 12 1920

Board Meeting. Letter from Smith threatening legal action. TH, 8 12 1920

Tubular bells. TDN, 15 12 1920

Collis Obituary. TH, 16 12 1920

 

1921

Bellringer returns from overseas with ideas. TH, 12 1 1921

Board Meeting. TH, 12 1 1921

Row boats and hot water available at Park. TH, 12 1 1921

Near drowning. TH, 26 1 1921

Sports Ground Committee – Groundsman. TH, 26 1 1921

Hot water. TH, 1 2 1921

Board Meeting – Question of Control. TH, 2 2 1921

Park control. TH, 3 2 1921

Question of control. TH, 15 2 1921

Control of park. TH, 22 2 1921

Sports committee fundraising. TH, 23 2 1921

Acclimatisation Society hatchery. TH, 2 3 1921

Board meeting. TH, 9 3 1921

Board meeting. TH, 6 4 1921

Board meeting. TH, 6 4 1921

Acclimatisation society. TH, 19 4 1921

Chopping competition. TH, 22 4 1921

Board Meeting- Burgess resigns. TDN, 4 5 1921

Board Meeting. TH, 4 5 1921

Board Meeting. TH, 8 6 1921

Hatchery ready. TH, 17 6 1921

W L Newman Obituary. TH, 18 6 1921

Damage in park. TH, 6 7 1921

Pukekura Park Board A.G.M. TH, 6 7 1921

Springbok ad. TH, 12 7 1921

Special meeting – fernery – rhodo dell. TH, 15 7 1921

Springbok game – famous draw. TDN, 18 7 1921

Hatchery news. TH, 21 7 1921

Proposed sportsground improvements. TDN, 23 7 1921

Hatchery news. TH, 30 7 1921

Board Meeting. TH, 3 8 1921

Trout released. TDN, 15 8 1921

Story of hatching. TDN, 20 8 1921

Board Meeting. TH, 7 9 1921

Sports Ground improvements. TH, 10 9 1921

Fry released. TDN, 19 9 1921

Opening up of Gilbert St. TDN, 27 9 1921

Sports Ground Improvement. TH, 29 9 1921

Board Meeting. TH, 5 10 1921

Sports Ground Improvements. TH, 7 10 1921

Board Meeting. TH, 2 11 1921

Sports Ground Update. TH, 3 11 1921

Clement Wragge. TDN, 24 11 1921

Sports Ground fundraising. TH, 2 12 1921

John Wheeler donation. TH, 7 12 1921

Board Meeting. TH, 7 12 1921

Damage to Sports Ground. TH, 30 12 1921

1922

1923

1924

1925

1926

Scout rally and camp in the Park. TDN, 4 1 1926

Acclimatisation Society – Hatchery matters. TH, 20 1 1926

Board Meeting. TH, 20 1 1926

Visitors – ducks – albatross. TH, 20 1 1926

Visitors to the park – new tractor. TH, TH 6 1 1926

Board Meeting. TH, 17 2 1926

Swimming gala. TDN, 4 3 1926

Swimming carnival – Fernery fundraiser. TDN, 5 3 1926

Swimming carnival  success. TDN, 12 3 1926

Board Meeting. TH, 17 3 1926

Fireworks display. TDN, 19 3 1926

Anzac service. TDN, 26 4 1926

Board Meeting.  A.G.M TH, 28 4 1926

Board Meeting. TH, 26 5 1926

Fernery to commence – funds needed. TDN, 16 6 1926

Fernery to commence – funds needed. TH, 16 6 1926

Board Meeting. TDN, 16 6 1926

Board Meeting. TH, 16 6 1926

Fernery appeal. TDN, 17 6 1926

Acclimatisation notes _hatching. TH, 19 6 1926

Hatchery news. TDN, 23 6 1926

Works in Progress. TH, 29 6 1926

Fundraising circular for building Fernery. TH, 4 7 1926

Improvement funds. TH, 13 7 1926

Park collection – Fernery appeal. TH, 16 7 1926

Construction of fernery. TH, 19 7 1926

Fernery progress. TDN, 20 7 1926

Park appeal. TH, 20 7 1926

Status of board members. TH, 20 7 1926

Board Meeting – Fernery fund collection. TH, 21 7 1926

Board Meeting. TH, 18 8 1926

Missing man. TH, 23 8 1926

Body found. TH, 30 8 1926

Board Meeting. TH, 22 9 1926

Board Meeting. TH, 20 10 1926

Seat donations. TDN, 21 10 1926

Seat donations. TDN, 26 10 1926

Fireworks display. TDN, 9 11 1926

Board Meeting. TH, 17 11 1926

Seats donated. TDN, 17 11 1926

Fire Service Display. TDN, 2 12 1926

Board Meeting. TH, 21 12 1926

1927

Board Meeting. TH, 19 1 1927

Sports Ground improvements. TH, 10 2 1927

Amateur Athletics night meeting. TDN, 21 2 1927

Board Meeting. TH, 23 2 1927

Royal Visit. TH, 3 3 1927

Upkeep of parks. TH, 15 3 1927

Board Meeting. TH, 18 3 1927

Rates for Park if transferred. TDN, 27 4 1927

Laying turf – Longburn soil. TDN, 1 4 1927

Acclimatisation Society. TH, 22 4 1927

Board Meeting A.G.M. TDN, 4 5 1927

Canadian soccer team beat Taranaki. TDN, 26 5 1927

Insufficient funds – suggest vesting in Borough. TDN, 22 6 1927

Board Meeting. TH, 22 6 1927

Support for transfer of Park. TDN, 24 6 1927

Goose dies . TDN, 13 7 1927

Board Meeting. TH, 13 7 1927

Hatchery news. TDN, 18 7 1927

Newton King bequest. TDN, 11 8 1927

Hatchery  news. TDN, 12 8 1927

Board Meeting. TH, 17 8 1927

Proposal to vest Park in Borough Council. TDN, 30 8 1927

Board Meeting. TDN, 14 9 1927

Fernery update. TDN, 15 9 1927

Acclimatisation meeting extract – Hatchery shutdown. TH, 19 9 1927

Control of park. TDN, 20 9 1927

Park to be vested in council. TDN, 20 9 1927

White swan found dead. TDN, 20 9 1927

Description of new Fernery. TDN, 21 9 1927

Rats in the hatchery. Thames Star, 26 9 1927

Floodlighting sports ground TH, 1 10 1927

Floodlighting of sports ground. TH, 3 10 1927

Death of birds. TDN, 12 10 1927

Board Meeting. TH, 12 10 1927

Visitors view. TH, 3 11 1927

Fireworks display. TDN, 7 11 1927

Board Meeting. TH, 9 11 1927

Letter from nurse Cavell’s sister. TDN, 11 11 1927

Sports Ground Improvements. TDN, 9 12 1927

Eels in the park – protecting ducklings. TDN, 13 12 1927

Fernery and rhododendron dell. TDN, 14 12 1927

Horton granted six months leave. TDN, 14 12 1927

Board Meeting. TH, 14 12 1927

Park to be vested in borough. TDN, 20 12 1927

1928

1929

1930

1931

1932

1933

1934

Fernery visitors. TH, 3 1 1934

Brooklands stables to go. TDN, 8 1 1934

Access to Brooklands List and Wilkinson properties. TH, 10 1 1934

Brooklands property. Suggested improvements. TDN, 10 1 1934

Caledonian Sports. TH, 10 1 1934

Committee meeting – opening of Brooklands. TDN, 10 1 1934

Gift of native bush. Maranui Gully. TDN, 10 1 1934

Board Meeting. TH, 10 1 1934

Notice of Opening of Brooklands. TH, 20 1 1934

Brooklands Lake Pic. NZ Herald, 26 1 1934

Proposed Brooklands opening day. TH, 30 1 1934

Main Lake and Tea House picture. AWN, 7 2 1934

Caledonian Sports. TH, 22 1 1934

BM Brookland Opening – Arrangements made. TH, 27 2 1934

Brooklands By-laws. TH, 27 2 1934

Today is Brooklands opening day -pictures. TH, 10 3 1934

Bledisloe Speech at Brooklands opening. Evening Post, 12 3 1934

Brooklands opening Ceremony. TH, 12 3 1934

Brooklands opening Ceremony. TDN, 12 3 1934

Description of Brooklands Garden. TDN, 12 3 1934

Growth of Brooklands. TDN, 12 3 1934

Brooklands opening day. TH, 16 3 1934

Brooklands chestnut. TH, 22 3 1934

Proposed Hughes plating kauri. TH, 29 3 1934

Board Meeting. Rhodo Dell. TH, 29 3 1934

Brooklands handover Eliot King. TH, 16 3 1934

Board Meeting. TH, 5 4 1934

Hughes kauri planting. TH, 6 4 1934

Huges kauri planting photo. TH, 11 4 1934

Huges kauri planting photo . TH, 11 4 1934

Anzac Parade. TH, 26 4 1934

Brooklands stables cleared and replanted. TDN, 12 5 1934

Ceremonial spade found. TDN, 18 5 1934

Brooklands demolition. Patea Mail, 15 6 1934

Board Meeting. TH, 24 7 1934

Work at Brooklands. TH, 24 7 1934

Spade to be mounted in kiosk. Auckland Star, 30 7 1934

T. C. List tribute. TH, 22 8 1934

Fillis Street reserve. TDN, 4 9 1934

Committee meeting. TH, 26 9 1934

Committee meeting – Sports Ground. TH, 10 10 1934

Sportsground improvements. TDN, 13 11 1934

Committee meeting. TH, 14 11 1934

Committee meeting. TH, 14 11 1934

Committee meeting TH, 12 12 1934

1935

1936

1937

1938

1939

1940

1941

1942

1943

1944

1945

1946

1947

Christmas visitors. TH, 3 1 1947

Ducklings in park. TH, 18 1 1947

War on eels. TH, 1 2 1947

Estimated Subsidy. TH, 11 2 1947

Committee meeting. TH, 12 2 1947

Horton on kauris. TH, 25 2 1947

Committee meeting .TH, 19 3 1947

Resealing drive. TDN, 19 3 1947

Small lorry needed. TH, 19 3 1947

Lord and Lady Bledisloe picture. TH, 20 3 1947

Sports Ground revenue. TH, 25 3 1947

Use of park for rugby league. TH, 26 3 1947

J.C.O.C summary of Park condition. TH, 27 3 1947

Junior Chamber of Commerce report. TH, 27 3 1947

Junior Chamber of Commerce report  letter. TH, 28 3 1947

Athletics. TH, 2 4 1947

Committee answers criticism. TH, 16 4 1947

Spade gifted to museum. TH, 16 4 1947

Conference to be held about park future. TH, 22 4 1947

Committee meeting. TH, 14 5 1947

Trapping eels. TH, 15 5 1947

Standish bequest. TH, 17 5 1947

Conference re parks organisation. TH, 27 5 1947

Tennis club asked to go. TH, 13 6 1947

Rhododendrons to move. TH, 16 6 1947

Rhododendrons moved. TH, 8 7 1947

Cyclists. TH, 9 7 1947

Park costs. TH, 9 7 1947

Committee meeting. TH, 9 7 1947

Record of donors. TH, 9 7 1947

Storm damage. TH, 9 7 1947

Letter- Park costs. TH, 10 7 1947

Park costs. TH, 11 7 1947

Summary of Borough reserves in 1947. TH, 11 7 1947

Old drains blocked. TH, 29 7 1947

Committee meeting. TH, 13 8 1947

Letter re Tennis Club relocation 1. TH, 15 8 1947

Letter re Tennis Club relocation 2. TH, 15 8 1947

Park shelter. TH, 15 8 1947

Letter re Tennis Club relocation. TH, 16 8 1947

Park case for moving Tennis Club put to Council. TH, 19 8 1947

Menace of trees to telephone lines. TH, 20 8 1947

Tree removal for telephone lines. TH, 10 9 1947

Attack by swan. TH, 11 10 1947

Blue Gums to go. TH, 15 10 1947

Cannon Hill. TH, 24 10 1947

20lb eel caught. TH, 11 11 1947

Outside advice sought on planting. TH, 12 11 1947

Committee meeting. TH, 12 11 1947

Ducklings in the park. TH, 1 12 1947

Governor General. TH, 8 12 1947

Huthnance report. TH, 16 12 1947

Committee meeting. TH, 17 12 1947

Fewer visitors – polio epidemic. TH, 30 12 1947

1948

Band recital. TH, 5 1 1948

Begonia display – best ever. TH, 15 1 1948

Interest in Begonias. TH, 20 1 1948

Deterioration Goes on. TH, 11 2 1948

Need for ladies pavilion. TH, 11 2 1948

Park Grant overdrawn. TH, 11 2 1948

Park problems. TH, 11 2 1948

Committee meeting. TH, 11 2 1948

Submission to council. TH, 17 2 1948

Damage to park. TH, 29 3 1949

Visitors’ comments. TH, 13 4 1948

Park subsidies. TH, 27 4 1948

Lady Baden Powell. TH, 28 4 1948

Ladies pavilion needed. TH, 5 5 1948

Committee meeting. TH, 5 5 1948

Comment on park issues. TH, 2 6 1948

Future of Park. TH, 2 6 1948

Ladies changing room. TH, 2 6 1948

Tennis club to move. TH, 2 6 1948

Stainton OBE. TH, 10 6 1948

Pines to go. TH, 15 6 1948

Felled trees removed. TH, 8 7 1948

Committee invite Institute of Horticulture to add member. TH, 14 7 1948

Committee meeting. TH, 14 7 1948

Park maintenance. TH, 27 7 1948

Spanish Chestnut pic. TH, 7 8 1948

Children’s interest in park sought. TH, 11 8 1948

Planting in the Park. TH, 11 8 1948

Park Committee appointment. TH, 17 8 1948

Speedway Plan. TH, 17 8 1948

Junior Chamber of Commerce to support park. TH, 19 8 1948

New Ladies dressing shed. TH, 1 10 1948

Flower prep for cancelled royal visit. TH, 2 10 1948

Kiosk burgled. TH, 13 10 1948

Ladies dressing shed update. TH, 13 10 1948

Speedway. TH, 13 10 1948

Horton to retire. TH, 6 11 1948

Horton to retire picture. TH, 6 11 1948

Help to clear Fillis Street Gully. TH, 9 11 1948

Committee meeting. TH, 12 11 1948

The Poet’s Bridge to be repainted. TH, 12 11 1948

Carols by candlelight. TH, 16 11 1948

Unauthorised entry into fernery. TH, 29 11 1948

Sports Day. TH, 1 12 1948

Sports Day. TH, 4 12 1948

Fundraising. TH, 6 12 1948

Sports Day. TH, 6 12 1948

J C O C fundraising donation. TH, 8 12 1948

Hooked a swan. TH, 14 12 1948

Carols by Candlelight ad. TH, 18 12 1948

Carols by Candlelight. TH, 20 12 1948

1949

Twilight Sports. TH, 5 1 1949

Visitors plea for map. TH, 8 1 1949

Fernery and Boat takings. TH, 13 1 1949

Ladies Dressing shed almost complete. TH, 27 1 1949

Asking for farmers help. TH, 1 2 1949

Historic Gables. TH, 11 2 1949

Pipe Band Contest. TH, 12 2 1949

Gable 100 years old Pic. TH, 17 2 1949

Overall superintendent to be appointed. TH, 22 2 1949

Olympic runner for sports event. TH, 2 3 1949

Track meeting results. TH, 5 3 1949

Plant donation. TH, 10 3 1949

Picture in the park. TH, 12 3 1949

Dominion Pipe band contest opens. TH, 18 3 1949

Pipe band comp. TH, 19 3 1949

Pipe band comp. TH, 19 3 1949

Pipe band comp. TH, 21 3 1949

Picture Ladies Pavilion. TH, 26 3 1949

Committee meeting. TH, 30 3 1949

Thomas Horton’s retirement function. TH, 31 3 1949

More money needed for sportsground development. TH, 13 4 1949

Origin of The Poets Bridge red colour. TH, 13 4 1949

Park boats pay way. TH, 13 4 1949

Committee meeting. TH, 13 4 1949

Rearing ferns. TH, 13 4 1949

Committee meeting. TH, 11 5 1949

Tree vandalism. TH, 11 5 1949

New curator. TH, 23 5 1949

Chestnut tree dimensions. TH, 15 6 1949

New curator. TH, 15 6 1949

Fireworks. TH, 13 7 1949

Committee meeting. TH, 13 7 1949

Sportsground. TH, 13 7 1949

Repairs to park. TH, 10 8 1949

Carols by Candlelight. TH, 14 9 1949

Fire hazard. TH, 14 9 1949

Fireworks. TH, 12 10 1949

Flower display. TH, 12 10 1949

Goodwin protests. TH, 12 10 1949

Increased subsidy asked for. TH, 12 10 1949

Kuru Rd sportsground . TH, 12 10 1949

Splash of colour. TH, 12 10 1949

Sports Ground article. TH, 12 10 1949

Sports Ground widely sought. TH, 12 10 1949

Teahouse picture. TH, 5 11 1949

Backlog of work. TH, 9 11 1949

Fireworks display. TH, 9 11 1949

Sports Ground. TH, 9 11 1949

Appeal for funds. TH, 14 12 1949

Carols by Candlelight. TH, 14 12 1949

Cycles and Vandalism. TH, 14 12 1949

List Street path progress. TH, 14 12 1949

Opossums. TH, 14 12 1949

Use of sportsground. TH, 14 12 1949

Carols by Candlelight. TH, 27 12 1949

1950

1951

Boat and Fernery taking good. TH, 4 1 1951

Park recorded music Concerts popular. TH, 23 1 1951

Park recorded music concerts. TH, 25 1 1951

Letter promoting sound shell. TH, 27 1 1951

Damage north of west terrace. TH, 14 2 1951

Committee meeting. TH, 14 2 1951

The gables to be painted. TH, 14 2 1951

Vandalism – Boat takings – staff pay rise. TH, 14 2 1951

Staff pay rise on hold. TH, 20 2 1951

Facelift for Kiosk. TH, 14 3 1951

New Admin building needed. TH, 14 3 1951

Committee meeting. TH, 14 3 1951

Brooklands lake to be drained. TH, 11 4 1951

Committee meeting. TH, 11 4 1951

Recorded music concerts in the Park. TH, 11 4 1951

Eradication of Paspalum. TH, 12 4 1951

Date set for Tennis Club to relocate1. TH, 1 5 1951

Date set for Tennis Club to relocate 2. TH, 1 5 1951

Fireplace to be repaired. TH, 16 5 1951

Committee meeting. TH, 16 5 1951

Committee meeting. TH, 13 6 1951

Committee meeting. TH, 11 7 1951

New nursery at Brooklands. TH, 5 9 1951

Committee meeting. TH, 12 9 1951

Carols by candlelight given go-ahead. TH, 10 10 1951

High School Boys working on park path. TH, 10 10 1951

Committee meeting. TH, 10 10 1951

Graham bequest. TH, 15 10 1951

Graham bequest. TH, 16 10 1951

Fireworks display crowd of 14000. TH, 5 11 1951

Picture of Rhododendron Dell. TH, 10 11 1951

Summary of park needs. TH,15 11 1951

Brooklands Park Drive Street name suggested. TH, 16 11 1951

Committee considers 33 suggestions. TH, 16 11 1951

Committee meeting. TH, 16 11 1951

Native birds shot in the park. TH, 19 12 1951

Committee meeting. TH, 19 12 1951

Tender accepted for new staff building. TH, 19 12 1951

4000 attend carols by Candlelight. TH, 24 12 1951

1952

1953

Demand for Boats exceeds supply TH, 10 1 1953

Soundshell suggested TH, 10 1 1953

Work started on moving Tennis and Croquet Clubs TH, 30 1 1953

Children’s play area approved TH, 17 2 1953

First Graham Bequest payment received TH, 17 2 1953

Glowworm caves considered TH, 17 2 1953

Committee meeting. TH, 17 2 1953

Disposal of Graham Gold Cups considered. TH, 18 2 1953

Plans for Royal visit. TH, 18 2 1953

South African cricket game picture. TH, 20 3 1953

South African cricketers impressed with the park. TH, 20 3 1953

Dismantling of tennis courts. TH, 15 4 1953

Donation – Boat hire. TH, 15 4 1953

Graham Gold Cups to be sold. TH, 15 4 1953

Sports Ground to be Floodlit. TH, 15 4 1953

Trial Glow-worm Grotto. TH, 15 4 1953

Dismantling tennis club. TH, 2 5 1953

Breaking up of tennis courts. TH, 7 5 1953

Improved corner for traffic area. TH, 13 5 1953

New Boat-Shed Bridge. TH, 13 5 1953

Planting of Tennis Court area. TH, 13 5 1953

Boat Shed Bridge collapse. TH, 26 5 1953

Coronation Celebration. TH, 2 6 1953

Duck left in a hurry. TH, 2 6 1953

Partial draining of lake re Boatshed Bridge. TH, 8 6 1953

Park may be illuminated. TH, 10 6 1953

Park projects. TH, 10 6 1953

Park takings. TH, 10 6 1953

Problem cleaning lake. TH, 10 6 1953

Park problems. TH, 11 6 1953

Park problems. TH, 24 6 1953

Boatshed Bridge poem. TH, 2 7 1953

Cleaning lake – sluicing suggested. TH, 15 7 1953

Park secretary calls for unity. TH, 15 7 1953

Playground equipment ordered. TH, 15 7 1953

Request for urgent action on silting. TH, 21 7 1953

Tennis Club area ready for planting. TH, 23 7 1953

Tennis Club pavilion being dismantled. TH, 29 7 1953

Tender advert for Boatshed Bridge. TH, 31 7 1953

Graham bequest cups. TH, 12 8 1953

Main lake depth amazes. TH, 12 8 1953

Model Railway. TH, 12 8 1953

Paddling Pool expensive. TH, 12 8 1953

Park boats popular. TH, 12 8 1953

Tender for Boatshed Bridge accepted. TH, 18 8 1953

Heating the Fernery. TH, 9 9 1953

No action on Floodlighting. TH, 9 9 1953

Rhododendrons to move. TH, 9 9 1953

Heating Begonia House. TH, 14 10 1953

Paddling Pool Delayed. TH, 14 10 1953

Amoore Bequest. TH, 3 11 1953

Bulletin Board for Park. TH, 11 11 1953

Coloured lights for Fernery. TH, 11 11 1953

Outdoor Concert. TH, 11 11 1953

Preparation for Royal Visit. TH, 9 12 1953

Committee meeting. TH, 9 12 1953

Record attendance at fernery. TH, 28 12 1953

1954

Band Recital. TH, 4 1 1954

Preparation for Royal visit. TH, 7 1 1954

Preparation for Royal visit. TH, 7 1 1954

Queens visit to New Plymouth. TH, 9 1 1954

Royal Visit. TH, 11 1 1954

Hundreds enjoy music. TH, 18 1 1954

Fernery popular. TH, 20 1 1954

January figures set new record. TH, 30 1 1954

Christmas lights to be dismantled. TH, 10 2 1954

Illuminated Fountain proposed. TH, 10 2 1954

Maori House for Park. TH, 10 2 1954

Sound Shell proposed. TH, 10 2 1954

No action on Sound Shell. TH, 12 2 1954

Letter to Editor re Sound Shell. TH, 13 2 1954

Spanish Chestnut. TH, 1 4 1954

Control of Gilbert St Sections. TH, 14 4 1954

Fountain estimates. TDN, 14 4 1954

Fountain location suggestions. TH, 14 4 1954

Park Duck killed by Arrow. TH, 14 4 1954

Park Lights. TDN, 14 4 1954

Committee meeting. TH, 14 4 1954

Sports Ground lighting. TH, 14 4 1954

Wardens for the Park. TH, 14 4 1954

Shonbachler retires. TH, 15 4 1954

Cost of Floodlighting and Fountain. TH, 3 6 1954

Park fountain. TDN, 3 6 1954

Citizen wardens. TDN, 9 6 1954

Fountain voluntary effort proposed. TH, 9 6 1954

No Fireworks display. TH, 9 6 1954

Park fountain memorial to athletes. TDN, 9 6 1954

Park priorities and Fountain. TH, 9 6 1954

New boathouse advocated. TDN, 16 6 1954

Sconbachler leaving do. TH, 16 6 1954

Sound Shell discussed. TH, 26 6 1954

Cost of Fountain to be investigated. TH, 21 7 1954

Fountain to commemorate royal visit. TDN, 21 7 1954

Kindergarten looking for site at Pukekura. TH, 21 7 1954

Park has its friends. TDN, 21 7 1954

Opposition to Fountain. TH, 22 7 1954

Societies favour Sound Shell. TH, 24 7 1954

Festival of sports proposed. TDN, 11 8 1954

Floodlights Essential. TH, 11 8 1954

Fountain favoured. TH, 11 8 1954

Fountain to proceed. TDN, 11 8 1954

Soundshell. TH, 11 8 1954

Sporting facilities discussed. TDN, 11 8 1954

Support for soundshell. TDN, 11 8 1954

Amoore Bequest. TH, 12 8 1954

Warden cartoon. TH, 12 8 1954

Wardens appointed. TH, 17 8 1954

Fountain Lake drained. TH, 20 8 1954

Opposition to Fountain. TH, 20 8 1954

Wardens can issue Warrants. TH, 24 8 1954

Thomas Sinclair bequest. TDN, 25 8 1954

Fountain Plans being prepared. TH, 22 9 1954

No reports of Cycling. TH, 22 9 1954

Improvements. TDN, 23 9 1954

Native tree collection. TDN, 23 9 1954

Plans for Fountain almost ready. TH, 1 10 1954

Pine felled. TH, 8 10 1954

Truck stuck in lake. TH, 12 10 1954

Brooklands lake may be cleaned. TH, 13 10 1954

Case for soundshell. TDN, 13 10 1954

Christmas Lights. TH, 13 10 1954

Deepening of Fountain Lake. TH, 13 10 1954

Digger begins on lower lake. TDN, 13 10 1954

Dry rot in kiosk. TDN, 13 10 1954

Fountain brochure. TH, 13 10 1954

Sound Shell decision deferred. TH, 13 10 1954

Soundshell and fountain. TH, 13 10 1954

Staff room. TDN, 13 10 1954

Muddy conditions hamper fountain progress. TH, 14 10 1954

Brooklands lake to be cleaned. TDN, 16 10 1954

Removal of Park Island. TH, 18 10 1924

Builders asked to help with fountain. TH, 10 11 1954

Fountain plans arrive. TDN, 10 11 1954

Lease of Park area favoured for kindergarten. TH, 10 11 1954

Rhododendron display. TDN, 11 11 1954

Rare shrub in bloom. TH, 12 11 1954

Letter opposing fountain L C Hughes. TH, 3 12 1954

Reply to critics re fountain. TH, 9 12 1954

Letters opposing fountain. TH, 10 12 1954

Letter opposing fountain. TH, 13 12 1954

Committee defends decision to build fountain. TH, 15 12 1954

Ladies room. TDN, 15 12 1954

Letters re fountain. TH, 15 12 1954

New female staff building planned. TH, 15 12 1954

Letter pro fountain. TH, 16 12 1954

Clay brought in to fill Lily Pond. TH, 21 12 1954

Council wants new discussion re fountain. TH, 21 12 1954

Support for fountain. TDN, 21 12 1954

Council approves fountain order. TH, 23 12 1954

Council order of fountain explained. TH, 23 12 1954

Fountain cartoon. TH, 23 12 1954

Christmas lights advert. TH, 24 12 1954

Fernery popular. TDN, 27 12 1954

1955

Truck delivering fill to lily pond picture. TH, 27 1 1955

Fountain construction to start. TDN, 31 1 1955

Progress on fountain. TDN, 5 2 1955

Fountain progress. TDN, 9 2 1955

Female quarters approved. TDN, 10 2 1955

Kindergarten site. TDN, 10 2 1955

Takings fall. TDN, 10 2 1955

Trees attacked by bronze beetle. TDN, 10 2 1955

Fountain on schedule. TDN, 22 2 1955

Fountain in final stages. TDN, 10 3 1955

Thinning trees. TDN, 16 3 1955

Fountain construction picture. TDN, 23 3 1955

Fountain construction picture. TDN, 23 3 1955

Lake nearing completion. TDN, 23 3 1955

Plumbing fountain picture. TDN, 28 3 1955

Fountain to start at easter. TDN, 29 3 1955

Fountain to start at easter picture. TDN, 29 3 1955

Fountain test. TDN, 4 4 1955

Fountain test picture. TDN, 4 4 1955

Letter defending fountain. TH, 5 4 1955

Letter of support for fountain. TH, 5 4 1955

Letter opposing fountain. TH, 5 4 1955

Fountain rehearses. TDN, 7 4 1955

Fountain rehearses picture. TDN, 7 4 1955

Fountain opening day. TH, 11 4 1955

Opening display by fountain. TDN, 11 4 1955

Big crowd at fountain. TDN, 12 4 1955

Park takings. TDN, 12 4 1955

Cars barred from park at night. TDN, 13 4 1955

Fountain appeal. TDN, 19 4 1955

Fountain sculpture. TDN, 19 4 1955

Fountain display. TDN, 3 5 1955

Seat donation. TDN, 3 5 1955

Fountain poem. TDN, 4 5 1955

Letter supporting fountain. TDN, 7 5 1955

Fountain fund. TDN, 11 5 1955

Fountain reputation. TDN, 11 5 1955

Sparrow Hawk playing havoc with other birds. TDN, 11 5 1955

Test bores for pavilion. TDN, 11 5 1955

Staff rest room tender. TDN, 24 5 1955

Fountain draws crowds. TDN, 6 6 1955

Increased subsidy sought. TDN, 15 6 1955

No fireworks. TDN, 15 6 1955

Rail around lake. TDN, 15 6 1955

Reduction in fountain playing hours. TDN, 15 6 1955

Takings. TDN, 15 6 1955

Tender accepted for rest room. TDN, 15 6 1955

Money to make money. TDN, 12 7 1955

Seats for fountain watchers. TDN, 12 7 1955

Azalea Dell. TDN, 13 7 1955

Reduction in vandalism. TDN, 13 7 1955

Slipping terrace. TDN, 13 7 1955

Special fountain displays. TDN, 13 7 1955

Takings. TDN, 13 7 1955

Test bores for pavilion. TDN, 13 7 1955

Light scheme to be put to sports bodies. TDN, 10 8 1955

New time clock for fountain. TDN, 10 8 1955

Reconditioning pavilion. TDN, 10 8 1955

Pavilion not ready. TDN, 14 9 1955

Scheme for lighting decided. TDN, 14 9 1955

Rare plants sought. TDN, 15 9 1955

Fountain times. TDN, 12 10 1955

Pavilion estimate. TDN, 12 10 1955

Unsafe lighting. TDN, 12 10 1955

Temporary lights. TDN, 26 10 1955

Cypress canker. TDN, 9 11 1955

Fountain running costs. TDN, 9 11 1955

Night concert suggested. TDN, 9 11 1955

Takings. TDN, 9 11 1955

Pavilion plans approved. TDN, 22 11 1955

Shows how he would light park. TDN, 12 12 1955

Lights considered successful. TDN, 15 12 1955

To investigate artistic lighting. TDN, 15 12 1955

1956

Fundraising five-day carnival. TDN, 20 1 1956

Native birds in Park. Jack Goodwin. Forest and Bird, 1 2 1956

Pavilion tender TDN, 9 2 1956

Sports gala. TDN, 27 2 1956

Ducks find use for fountain. TDN, 7 3 1956

Native birds increased. TDN, 7 3 1956

Fountain to be overhauled. TDN, 14 3 1956

Fountain display to cease. TDN, 29 3 1956

Pavilion tender accepted. TDN, 29 3 1956

2000 watch fountain. TDN, 31 3 1956

Committee meeting. TH, 9 5 1956

Floodlights. TDN, 10 5 1956

Horticultural development. TDN, 10 5 1956

Paspalum. TDN, 10 5 1956

Lighting. TDN, 11 5 1956

Park fountain. TDN, 12 5 1956

Kindergarten proposal for park. TH, 30 5 1956

Water carnival. TDN, 13 6 1956

Chemical tests on sportsground. TH, 11 7 1956

Fountain display for hockey team. TH, 11 7 1956

Support for water carnival .TH, 11 7 1956

Water carnival. TDN, 11 7 1956

Visitors see fountain. TDN, 23 7 1956

Truby King dell. TDN, 3 8 1965

Truby King dell. TDN, 6 8 1956

Cottage. TDN, 22 8 1956

Drainage survey. TDN, 22 8 1956

Skyscape. TDN, 22 8 1956

Drainage. TDN, 12 9 1956

Record takings. TDN, 12 9 1956

Permanent lights sought for Sports Grounds. TH, 26 9 1956

Restoration of lights wanted. TDN, 5 10 1956

Committee meeting. TH, 10 10 1956

Delays over Park lighting criticised. TDN, 2 11 1956

Cabbage trees to go. TH, 14 11 1956

Carnival spirit. TDN, 14 11 1956

Permanent lighting delayed. TDN, 14 11 1956

Committee meeting. TDN, 14 11 1956

Fountain lake drained. TDN, 7 12 1956

New pavilion almost complete. TDN, 7 12 1956

Path round lake to be lit. TDN, 7 12 1956

Park lights. TDN, 12 12 1956

Sports pavilion to be opened. TDN, 12 12 1956

Staff shortage. TDN, 13 12 1956

Floating stage. TDN, 19 12 1956

Park expenditure detailed at pavilion opening. TH, 21 12 1956

1957

Thousands visit Park TH, 11 1 1957

Water Carnival Advert TH, 12 1 1957

Thousands at Water Carnival. TH, 14 1 1957

Water carnival concludes. TDN, 14 1 1957

Water carnival picture. TDN, 14 1 1957

Committee meeting. TH, 13 2 1957

Curator sent overseas. TH, 13 3 1957

Committee meeting. TH, 13 3 1957

Colour a problem again. TDN, 10 4 1957

Horticultural sub-committee recommendations. TH, 10 4 1957

New kindergarten taking shape. TH, 10 4 1957

Committee meeting. TH, 10 4 1957

Committee meeting. TH, 10 4 1957

Shade may affect begonias. TDN, 10 4 1957

Bequest. TDN, 16 4 1957

Appeal for lights fund. TDN, 17 4 1957

Anniversary Day pageant. Photo news, April 1957

Australia v Taranaki cricket. Photo news, April 1957

 Australia v Taranaki cricket. Photo news, April 1957

Marching championships. photo news, April 1957

Sparrowhawk shot. TDN, 8 5 1957

Heating for kiosk. TDN, 15 5 1957

Committee meeting. TH, 15 5 1957

Boathouse plans amended. TDN, 16 5 1957

Plan for Park lighting approved. TH, 17 5 1957

Woman drowned. TDN, 18 5 1957

Kiosk lessee. TDN, 22 5 1957

Opening of Pukekura Kindergarten. TH, 10 6 1957

Use of natural amphitheatre. TH, 11 6 1957

Festival of the Pines. TH, 12 6 1957

New boat shed. TDN, 12 6 1957

Park committee approve plan for Bowl. TH, 12 6 1957

Will prepare amphitheatre. TDN, 15 6 1957

Council subsidies. TDN, 18 6 1957

Pavilion floor. TDN, 10 7 1957

Proposed boatshed. TDN, 10 7 1957

Plans for site of Festival of the Pines. TH, 24 7 1957

Boat shed location fixed. TH, 14 8 1957

Committee meeting. TH, 14 8 1957

Weyergang poem – Pukekura in Winter. TDN, 17 8 1957

Work begins on Bowl site – picture TH, 17 8 1957

Festival site assistance. TDN, 11 9 1957

Boatshed plans approved. TH, 11 11 1957

Poor response. TDN, 12 9 1957

Curators’ ideas. TDN, 18 9 1957

Boathouse tender. TDN, 19 9 1957

Festival lighting plans. TDN, 16 10 1957

Festival lighting finalised. TH, 24 10 1957

Five-year rights to festival site. TH, 24 10 1957

Sports Ground lighting. TDN, 24 10 1957

New Pukekura kindergarten opens. Photo News, 1957

Bowl stage plans accepted by Park Committee. TH, 13 11 1957

Fountain repairs. TDN, 13 11 1957

Work on new Boatshed Picture. TH, 13 11 1957

New Sportsground floodlights ready. TH, 3 12 1957

Will switch on lights. TDN, 3 12 1957

Coloured lights in the park. TDN, 10 12 1957

Enough aluminium for sound shell. TDN, 10 12 1957

More privacy for sportsmen. TDN, 10 12 1957

On with the sportsground lights. TDN, 10 12 1957

Committee meeting. TH, 10 12 1957

Purchase of plants for Park. TH, 10 12 1957

Working on Bowl of Brooklands. Photo News, Dec 1957

1958

Failing to help with festival. TDN, 17 1 1958

Bowl progress photo. TH, 27 1 1958

Queen Mothers visit. TH, 6 2 1958

Queen Mothers visit. Photo news, Feb 1958

Park staff help with festival. TDN, 12 2 1958

Sound Shell construction photo. TH, 13 2 1958

Makeup for Androcles the Lion. TH, 19 2 1958

Installing parabolic arch Photo News, 20 2 1958

Bowl at night. TH, 25 2 1958

Bowl like Hollywood. TDN, 25 2 1958

Bowl picture. TDN, 25 2 1958

Bowl picture. TH, 25 2 1958

Festival of the Pines. TH, 25 2 1958

Bowl picture before work started. TH, 25 2 1958

Bowl sponsors. TH, 25 2 1958

Bowl sponsors. TH, 25 2 1958

Festival of Pines most ambitious venture. TDN, 25 2 1958

Festival programme. TDN, 25 2 1958

Festival programme. TH, 25 2 1958

Wright Island TH, 25 2 1958

Bowl locality plan. TH,

Festival games. TDN, 26 2 1958

Festival games. TH, 26 2 1958

Festival games. TH, 26 2 1958

Festival facts. TH, 27 2 1958

Fumigating Bowl picture. TDN, 27 2 1958

The perfect blend. TDN, 28 2 1958

Festival variety night. TH, 1 3 1958

Miss Brooklands float. TH, 1 3 1958

A Fabulous weekend. TDN, 3 3 1958

An Act of Worship. TDN, 3 3 1958

Bowl was brimful. TDN, 3 3 1958

Festival concert Saturday. TDN, 3 3 1958

Proclamation of Miss Brooklands. TH, 3 3 1958

Wellington Ballet act of worship NZ orchestra. TH, 3 3 1958

Future plans and helpers thanked. TH, 4 3 1958

Memorable orchestral concert. TH, 4 3 1958

Conductors feedback on venue. TH, 5 3 1958

Festival ends a. TDN, 5 3 1958

Festival Helpers presented. TDN, 5 3 1958

Festival of the Pines profit and plans TH, 5 3 1958

Good profit expected from festival. TH, 5 3 1958

Good shooting but no score. TDN, 5 3 1958

Midsummer night’s dream comes true. TDN, 5 3 1958

National Orchestra on final night. TDN, 5 3 1958

Festival of Pines articles. TDN, 5 3 1958

FOP 3000 needed to improve bowl. TDN, 5 3 1958

Trust fund set up for bowl development. TH, 8 3 1958

Weyergang poem – Pukekura in Summer. TDN, 12 4 1958

Fountain times. TDN, 16 4 1958

Need to level athletic track. TDN, 16 4 1958

Committee meeting. TH, 16 4 1958

Soccer under floodlights. TH, 16 4 1958

Weed eradication. TDN, 17 4 1958

Brooklands development plan. TDN, 2 5 1958

Thomas Horton dies TH, 2 5 1959

Brooklands development plan. TH, 14 5 1958

Committee meeting. TH, 14 5 1958

Floodlit football a success. TDN, 14 5 1958

Cartoon, Brooklands development. TDN, 5 6 1958

Drainage costly. TDN, 11 6 1958

Sound Shell plans. TDN, 12 6 1958

Work to start on bowl. TDN, 3 7 1958

Clearing new path from racecourse. TH, 5 7 1958

3 Small articles. TDN, 9 7 1958

Dangerous trees felled. TH, 9 7 1958

Lippiatt resigns. TDN, 9 7 1958

Soundshell design approved. TDN, 9 7 1958

Trial ventilation system for fernery. TDN, 9 7 1958

Eliot King dies. TDN, 16 7 1958

Few volunteers. TDN, 8 8 1958

Reworking Bowl hillside slope – picture. TH, 27 8 1958

Tree felling in the park – picture. TH, 27 8 1958

Bowl of Brooklands Development Fund. TDN, 3 9 1957

Brooklands bowl appeal. TDN, 3 9 1958

Sportsground levelling costs. TDN, 10 9 1958

Bowl fund. TDN, 25 9 1958

Committee meeting. TH, 22 10 1958

E R C Gilmour dies. TDN, 30 10 1958

New sound shell being erected – picture. TH, 30 10 1958

Maintenance of festival site discussed and sound columns. TH, 12 11 1958

Tree removal policy. TH, 12 11 1958

Wants bowl grass cut. TDN, 12 11 1958

Flagpoles for Park wall suggested. TH, 10 12 1958

Litter collecting machine. TDN, 10 12 1958

No morning session for fountain. TH, 10 12 1958

Gelignite as solution to frog problem. TH, 12 12 1958

Too much croaking going on. TDN, 12 12 1958

Aerial photo. TDN, 17 12 1958

Bowl ready for children’s show. TDN, 22 12 1958

Picture of bowl. TDN, 22 12 1958

The frogs croaked on. TH, 22 12 1958

Christmas lights in the park picture. TDN, 22 12 1958

Rain mars children’s festival. TDN, 23 12 1958

Nativity scene pic. TDN, 24 12 1958

Working on the bowl Photo news, Dec 1958

1959

Frogmen called in. TH, 6 1 1959

Floodlit pipe band tattoo- picture. TH, 7 1 1959

How sound will be heard at festival. TDN, 8 1 1959

Installation of sound boxes a. TDN, 15 1 1959

Spectacular music for the bowl. TDN, 12 2 1959

40 years as secretary. TDN, 13 2 1959

Protective gear for staff. TDN, 13 2 1959

Festival of the Pines Programme. 1959 TH, 16 2 1959

Photo. TH, 16 2 1959

Photo. TH, 16 2 1959

Bowl more than annual event. TDN, 17 2 1959

Bowl tribute to the city. TDN, 17 2 1959

Cartoon. TDN, 17 2 1959

Festival facts. TH, 17 2 1959

Festival of the Pines 1959. TDN, 17 2 1959

Festival of the Pines. TDN, 17 2 1959

Boat on the lake TH, 18 2 1959

Festival facts TH, 18 2 1959

Puck A Midsummer night’s Dream. TH, 18 2 1959

Stereophonic variety heard at Brooklands. TDN, 20 2 1959

Cannons for 1812 overture. TH, 23 2 1959

Cannons for 1812 overture. TH, 23 2 1959

Evenings write up. TH, 23 2 1959

Miss Brooklands. TH, 23 2 1959

New Plymouth Girls choir. TH, 23 2 1959

National Orchestra. TH, 25 2 1959

Committee meeting. TH, 13 3 1959

New roof for begonia house. TDN, 17 4 1959

Committee meeting. TDN, 17 4 1959

Bowl of Brooklands Development Plan. TH, 7 5 1959

Committee meeting. TH, 15 5 1959

Use of park for model boats. TH, 15 5 1959

Committee meeting. TH, 12 6 1959

Committee meeting. TH, 17 7 1959

Removal of trees taking too long TH, 17 7 1959

Work for 20 at bowl. TDN, 20 7 1959

4000 for bowl facilities. TDN, 21 7 1959

Brooklands lake. TDN, 14 8 1959

Committee meeting TH, 14 8 1959

Volunteers on dressing room. TDN, 24 8 1959

Committee meeting. TDN, 18 9 1959

How the sportsground will be developed. TDN, 9 10 1959

How the sportsground will be developed. TDN, 9 10 1959

Committee meeting. TH, 9 10 1959

Working on the bowl. Photo news, Oct 1959

Boat landings in Fountain Lake. TH, 13 11 1959

New plants. TDN, 13 11 1959

Committee meeting. TH, 13 11 1959

Dog show. TDN, 16 11 1959

Choice of soil. TDN, 18 12 1959

New colour for fountain. TDN, 18 12 1959

Committee meeting. TH, 18 12 1959

Wiring system. TDN, 18 12 1959

Aerial photo. Photo news, Dec 1959

1960

Cast of Romeo and Juliet. TH, 9 2 1960

Committee meeting. TH, 12 2 1960

Swimming banned in Brooklands Lake. TH, 12 2 1960

About the festival. TH, 26 2 1960

About the festival. TH, 26 2 1960

Description of improved Bowl .TH, 26 2 1960

Festival programme. TH, 26 2 1960

National orchestra soloist and conductor. TH, 26 2 1960

Picture of Bowl with pines in background. TH, 26 2 1960

Picture of improved Bowl. TH, 26 2 1960

Fallen pine wrecks garden. TH, 29 2 1960

Festival opening night. TH, 29 2 1960

Festival opening night pic. TH, 29 2 1960

Festival opening night pic. TH, 29 2 1960

Festival facts. TH, 1 3 1960

Romeo and Juliet .TH, 1 3 1960

Festival facts. TH, 4 3 1960

Predicted loss for festival. TH, 8 3 1960

Sports Ground improvements. TH, 12 3 1960

Curator to report on future park plans – Sportsground update. TH, 18 3 1960

Gardener S Zavos in Brooklands – picture. TH, 4 4 1960

Fountain times. TDN, 16 4 1960

Committee meeting. TDN, 16 4 1960

Weather helps plants. TDN, 16 4 1960

Committee meeting. TH, 13 5 1960

Committee meeting. TH, 10 6 1960

Paddling pool. TDN, 15 7 1960

Overplanting to be resisted. TH, 12 8 1960

Plan for Park development. TH, 12 8 1960

Planning Pukekura. TH, 12 8 1960

Committee meeting. TH, 12 8 1960

Development plan adopted. TDN, 9 9 1960

New store shed to be built behind curator’s office… TDN, 9 9 1960

Proposal for new access road to bowl. TDN, 9 9 1960

Paddling pool under construction – picture. TH, 24 9 1960

Wicket will be ready. TDN, 14 10 1960

Committee meeting. TH, 11 11 1960

Installing Cats sculpture – picture. TH, 12 11 1960

Children playing in Paddling Pool – picture. TH, 28 11 1960

Ailsa McCrone working at nursery – picture. TH, 3 12 1960

Brookland nursery – picture. TH, 3 12 1960

Brookland nursery article – picture Miss I Small. TH, 3 12 1960

Fountain playing times. TDN, 9 12 1960

Park pipes rusty. TDN, 9 12 1960

Park nurseries. TH, 13 12 1960

1961

1962

1963

1964

1965

New Zealand National Band pic. TH, 4 1 1965

Bowl benefits from electronics. TH, 6 1 1965

Bowl improved TDN, 7 1 1965

Friends of Festival set up TDN, 7 1 1965

Ronald Brooker dies TDN, 14 1 1965

Volunteer. TH, 14 1 1965

Top athletes at park TDN, 16 1 1965

Work to resume on zoo cage. TH, 21 1 1965

Jaycees resume work at zoo. TH, 23 1 1965

Woodland stage at Bowl. Sunday Express, 31 1 1965

Committee meeting. TH, 17 2 1965

Carpark planned for Brooklands TDN, 18 2 1965

More native trees to be planted TDN, 18 2 1965

Committee meeting TDN, 18 2 1965

Festival of the Pines opening – February photo News.

Zoo opening TDN, 1 3 1965

Zoo opening. TH, 1 3 1965

No more monkeys yet for the zoo. TH, 16 3 1965

Committee meeting TDN, 17 3 1965

Rope donated to park. TDN, 17 3 1965

Fred Parker orchid donation TDN, 24 3 1965

Fred Parker orchid donation. TH, 24 3 1965

New Glasshouse for orchids. TH, 24 3 1965

Fountain Lake emptied – picture. TH, 9 4 1965

George Fuller to care for orchids. TH, 9 4 1965

To care for park orchids TDN, 9 4 1965

Committee meeting. TH, 28 4 1965

ANZAC Parade. May Photo News.

House for orchids TDN, 15 5 1965

Tom Sawyer play, photos – May photo News.

Log Cabin Ticket Box at Brooklands. TH, 20 7 1965

Access to Bowl. TH, 21 7 1965

Access to Bowl approved. TH, 8 8 1965

Committee meeting. TH, 22 9 1965

 Arbor Day planting at Brooklands – September Photo News.

Committee meeting. TH, 20 10 1965

Gables open to public – picture. TH, 13 11 1965

Committee meeting. TH, 17 11 1965

Committee meeting. TH, 15 12 1965

1966

1967

1968

1969

1970

1971

1972

1973

1974

1975

1976

1977

1978

1979

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

Lakes disgusting. Midweek, 18 2 2009

Lakes water quality issues. Midweek, 4 3 2009

Vandals attack cricket ground. TDN, 7 3 2009

King family get together. TDN, 10 3 2009

Kete website launch. TDN, 27 5 2009

Friends battle for park trees. TDN, 11 6 2009

Campaign to save trees. TDN, 15 6 2009

Campaign to save trees. TDN, 17 6 2009

New bowl access road. Midweek, 17 6 2009

Bowl access issue. TDN, 18 6 2009

Bowl access issue a. TDN, 18 6 2009

Bowl access tree issues. TDN, 19 06 2009

Bowl access tree issues a. TDN, 19 06 2009

Racing club wrongly blamed for access road issues. TDN, 20 6 2009

Fuller campaign to save tree. TDN, 22 6 2009

Bowl access road issue. TDN, 24 6 2009

Orsborn’s taking over tea house. TDN, 24 6 2009

Battle to save tree. TDN, 25 6 2009

Access road to Bowl summary part 1. TDN, 27 6 2009

Access road to Bowl summary part 2. TDN, 27 6 2009

Puriri tree near bowl access saved. part 1. TDN, 27 6 2009

Puriri tree near bowl access saved. part 2. TDN, 27 6 2009

Road row damaged council standing. TDN, 30 6 2009

George Fuller. TDN, 1 7 2009

Waterwheel under repair. Midweek, 1 7 2009

Lake covered for concert. TDN, 6 7 2009

Debate over covering bowl lake. TDN, 8 7 2009

Bowl seating plan annoys. Midweek, 15 7 2009

Friends fear for Bowl lake. TDN, 25 7 2009

Access issue resolved. TDN, 10 8 2009

Bowl access road contract let. TDN, 22 08 2009

Wisteria to get new pergola. Midweek, 26 08 2009

Work starts on access road. TDN, 8 9 2009

Ground water monitoring holes being bored. TDN, 29 9 2009

Kauri trees may have problem. TDN, 20 10 2009

The Poet’s Bridge being refurbished. TDN, 21 10 2009

Bowl access road nearly finished. TDN, 10 11 2009

Kauri not suffering from kauri rot. TDN, 17 11 2009

Curator makes presence felt. TDN, 20 11 2009

Wisteria support finished. TDN, 28 11 2009

Cricket practice nets proposal not welcomed. TDN, 2 12 2009

Lake weed removal. TDN, 8 12 2009

Cricket net queries. TDN, 9 12 2009

Cricket nets common sense. TDN, 10 12 2009

George Fuller saving puriri tree. TDN, 26 12 2009

2010

2011

2012

Drunk teen creates havoc. TDN, 6 1 2012

Judge jails park hooligan. TDN, 14 1 2012

Bolivian monkeys arrive at zoo. TD, 22 1 2012

Council to call for nets tender. TDN, 2 2 2012

Nets decision brings ODI back. TDN, 3 2 2012

Firebugs torch toilets. TDN, 13 2 2012

Container loos to the rescue. TDN, 24 2 2012

Fibre optic cables for the park. TDN, 24 2 2012

Monarchs at Brooklands. TDN, 24 2 2012

Zoo plants. TDN, 24 2 2012

Nets to start construction. TDN, 28 2 2012

Band Rotunda 125 years old. Midweek, 7 3 2012

Band Rotunda 125th celebration. TDN, 12 3 2012

Damage to fernery from storm. TDN, 21 3 2012

245 T shock. TDN, 22 3 2012

Chemical containers harmless. TDN, 23 3 2012

Nets construction underway. TDN, 30 3 2012

Baby tamarin monkeys die. TDN, 12 4 2012

Bolivian monkeys added to zoo. TDN, 13 4 2012

Nets less intrusive. TDN, 14 4 2012

Bolivian squirrel monkeys arrive. Midweek, 18 4 2012

Illegal dump to be covered with clay. TDN, 18 4 2012

Monkeys delight visitors. Midweek, 18 4 2012

Stage 3 of fernery upgrade to begin. TDN, 18 6 2012

Park wins certificate of excellence. TDN, 28 6 2012

Monkey needs a name. Midweek, 18 7 2012

Monkey named. TDN, 1 8 2012

New wetlands to keep park lakes cleaner. TDN, 6 8 2012

Work starts on new Brooklands toilets. TDN, 6 9 2012

Zoo’s alpacas. TDN, 20 9 2012

Old boats for sale. TDN, 25 9 2012

Old boats for sale. Midweek, 26 9 2012

Boat bonus for park. TDN, 2 10 2012

Silt trap to be built. TDN, 4 10 2012

Fernery to get new roof. TDN, 10 10 2012

Fernery to get new roof red. TDN, 10 10 2012

Park lakes to be cleaned. TDN, 17 11 2012

Park lake cleanout to cost more. TDN, 28 11 2012

Cricket nets completed. TDN, 12 12 2012

2013

Nets ready for inspection. TDN, 10 1 2013

Bicycle riding in the Park. TDN, 30 1 2013

Playground set for upgrade. TDN, 26 2 2013

Opposition to playground update. TDN, 2 3 2013

A Park like no other. TDN, 9 3 2013

A Park like no other. TDN, 9 3 2013

We can’t put a price on our Park. TDN, 9 3 2013

Stags delighted with practice nets. TDN, 12 3 2013

Dream to reintroduce kokako to the Park. TDN, 16 3 2013

Cherry trees get felled at Kaimata St entrance. TDN, 13 4 2013

Park entrances to get smartened up. Midweek, 17 4 2013

Band Rotunda closed for restoration. TDN, 19 4 2013

Desilting and Children’s Playground. TDN, 31 5 2013

Zoo gets Blue Tongue Skinks. TDN, 21 6 2013

Development of the Fernery. TDN, 22 6 2013

Playground upgrade begins with for removal. TDN, 25 6 2013

New birds at Brooklands. Midweek, 26 6 2013

Zoo receives Australian brolga. TDN, 27 6 2013

Lake banks reinforced with geotextile bags. TDN, 6 7 2013

New playground equipment being installed. TDN, 9 8 2013

Lake desilting equipment arrives. TDN, 12 8 2013

Lake dregs yield coffee machine. TDN, 21 8 2013

Lake cleanup abandoned. TDN, 4 9 2013

David Medway Obituary. TDN, 8 10 2013

Friends of the Bowl bowing out after 10 years. TDN, 17 10 2013

Playground ready for opening. TDN, 18 10 2013

ICC gives Park green light. TDN, 31 10 2013

Orchid man of Pukekura. TDN, 1 11 2013

Playground slides to be installed. TDN, 7 11 2013

Charlie the cockatoo. TDN, 8 11 2013

Sharing Pukekura Park’s IT secrets – George mason. TDN, 8 11 2013

Playground slides to be installed. Midweek, 13 11 2013

Water toy added to playground. TDN, 19 11 2013

2014

2015

2016

2017

2018

2019